Installation
3‐1
Part 7192568-03
E
2020 Nordson Corporation
Section 3
Installation
WARNING:
Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
Unpacking
WARNING:
Allow only authorized Nordson personnel to complete.
Upon receipt, unpack the Spectrum HD Generation II (SHD II) feed center
carefully to avoid damage. Report any damage immediately to the shipper
and to your Nordson representative. Save packing materials for possible
later use, or dispose of properly according to local regulations.
Preparing for Installation
WARNING:
Allow only authorized Nordson personnel to complete.
Position the SHD II feed center on a level floor, according to the general
layout drawing supplied by Nordson application engineering. Use the leveling
pads to level the feed center.
Fix the SHD II feed center to the floor using 3 L‐shaped brackets delivered
with the unit.
To ensure easy maintenance, provide a clear operating and access zone of
at least 1m (3 ft) wherever possible.
Damper Installation
A butterfly damper should be installed in the ductwork to the afterfilter. A
damper is supplied with the unit.
Extraction Duct Connection
Connect ductwork from the afterfilter/fan section to the SHD II feed center
with a properly sized transition duct. A rectangular transition duct is supplied
with the unit.