Instructions Manual
43
4. Preparation
ENGLISH
Outlet chute in transport
position
To facilitate transport, the outlet chute is
articulable. Lower it whenever you are
transporting the machine.
To place the chute in the transport position,
proceed as follows:
1.
With maximum care, release the lever (B)
and slowly, lower the chute.
2.
Attach the chute to the transport position
by securing the deflector (J) to the machine
arm with the bolt and wing nut (A).
The impacts on the chute during transport
may damage it if it is loose during transport.
When transporting the machine, secure the
chute with the bolt and wing nut (A).
4.1.1- Outlet chute in transport position
J
B
A
Содержание FTN-1000 Super G2
Страница 2: ......
Страница 3: ...FTN 1000 Super COSECHADORA DE FORRAJE ESPAÑOL ...
Страница 4: ...ESPAÑOL ...
Страница 106: ...106 Manual de Instrucciones 9 Especificaciones 9 3 Tabla de torque de tornillo Unidad de torque N m ...
Страница 107: ...Manual de Instrucciones 107 9 Especificaciones ESPAÑOL 9 4 Tabla de medidas de llaves ...
Страница 110: ...110 Manual de Instrucciones ...
Страница 111: ...FTN 1000 Super FORAGE HARVESTER ENGLISH ...
Страница 112: ...ENGLISH ...
Страница 213: ...Instructions Manual 103 9 Specifications ENGLISH 9 1 Dimensions in mm C D A B E A 3800 B 2810 C 2415 D 2190 E 1245 ...
Страница 214: ...104 Instructions Manual 9 Specifications 9 1 Bolt torque table Torque unit N m ...
Страница 215: ...Instructions Manual 105 9 Specifications ENGLISH 9 1 Gauge keys table ...
Страница 218: ...108 Instructions Manual ...
Страница 219: ......