3.3 Examples of Measured Waveform   

NOTE:    The waveforms shown in Table 3.3-1 are typical examples. Various waveforms are 
measured depending on conditions of the concrete.   

Table 3.3-1 Examples of Measured Waveform 

Examples of Measured Waveform

 

Comments

 

 

Waveform of impact force when 
hammering on healthy concrete 

It can be obtained as nearly bilaterally 
symmetric waveform at the peak.

 

 

 

Waveform of impact force when 
hammering on deteriorated surface of 
concrete

 

The rising time in the active phase is longer 
in comparison to the healthy concrete. The 
reason is that the time for the penetration of 
hammer with plastic deformation in the 
deteriorated surface is included. In contrast 
influence of the deteriorated surface is small 
in reactive phase.

 

 

Waveform of impact force when 
hammering on the surface of concrete 
with delamination: Case 1

 

This is the typical waveform that 
delamination is clearly observed in the 
relatively shallow site. The waveform is 
bilaterally symmetric in common with 
healthy surface, but there are some 
characteristics such as relatively small 
maximum value of the impact force and long 
contact time with hammer. It can be 
observed that the impact position shows the 
same behavior as the leaf spring. The 
waveform shows the fine bell shape but the 
duration time of the impact force becomes 
longer because of the low rigidity in 
comparison to the healthy concrete.

 

0

200

400

600

800

1000

1200

0

100

200

300

400

500

600

Forc

e

Time(μs)

0

200

400

600

800

1000

1200

0

100

200

300

400

500

600

Fo

rce

Time(μs)

0

200

400

600

800

1000

1200

0

100

200

300

400

500

600

Forc

e

Time(μs)

Содержание CTS-02V4

Страница 1: ...CTS 02V4 User Manual...

Страница 2: ...Disregarding this symbol and improper usage may cause injury or wounds and also cause physical damages to the person Examples of Symbols Symbol demonstrates prohibited acts In some cases a specific c...

Страница 3: ...cals etc It may cause a fire or other disasters Do not use anywhere gas is ignited It may cause fire or explosion Misuse of the batteries may cause contamination around a case by leakage of battery fl...

Страница 4: ...f what is written above Please consent to this in advance 5 This measurement instrument is not designed for use on the equipments or instruments that involve human lives or that require a high reliabi...

Страница 5: ...Start up CTS 02V4 PCprogrum 21 5 1 Startup CTS 02V4 PC program 21 5 2 Set up and Writing in of Measurement Parameters 23 5 3 Browsing of Parameters 27 5 4 Set up for Timer 27 5 5 Processing of Measure...

Страница 6: ...le 1 1 1 Name of Various Parts of Measurement Instrument Body No Name Contents Receptor for Connection To be used for connecting CTS 02V4 body to hammer unit USB Port To be used for transferring data...

Страница 7: ...Name Contents Hammerhead To make contact with a target object Hammer Cap To protect the sensor Do not use the cap side to make contact Grip To protect the sensor Do not use the cap side to make contac...

Страница 8: ...tection of delamination near concrete surface In this user manual the instrument will be referred to as the CTS 02V4 2 2 Specifications of CTS 02V4 Table 2 2 1 Table 2 2 1 Specifications of CTS 02V4 N...

Страница 9: ...gh humidity It may lead to damages to the instrument When hammering please use while lightly holding onto the grip The instrument cannot produce accurate results if hammered while holding the shaft or...

Страница 10: ...xmax is solved by Equation 3 2 and substituted into Equation 3 1 Thus Equation 3 3 can be obtained 0 max V F MK 3 3 MK means mechanical impedance and can be obtained by dividing the maximum force gene...

Страница 11: ...mber and N is used as 4 if the elastic coefficient is unchanged at NDT range of strain and at the end breaking time or 3 in the case of the normal concrete in taking account the reducing rate of the e...

Страница 12: ...ration based on the law of inertia 3 2 2 1 max max max max T T R T T A dt t A V dt t A V MA F 3 6 Here A is the acceleration and T2 is the time that acceleration reaches the maximum Fig 3 2 1 Waveform...

Страница 13: ...ive effects on measuring the elastic character such as plasticity of the concrete surface due to the deterioration The degree of deterioration on the surface can be calculated from the ratio of the ve...

Страница 14: ...luence of the deteriorated surface is small in reactive phase Waveform of impact force when hammering on the surface of concrete with delamination Case 1 This is the typical waveform that delamination...

Страница 15: ...rce when hammering on the concrete with the aggregate delamination This waveform can be obtained when hammering the concrete surface with the aggregate delamination caused by freezing and thawing acti...

Страница 16: ...ge of 0 01 units in STR value results in a change of an average of 0 67 N mm2 When the STR value is 1 37 and more change of 0 01 units in STR value results in a change of an average 2 09 N mm2 Spring...

Страница 17: ...amination is an aggregated delamination that is exposed by freezing and thawing of concrete or running water If aggregated delamination exists around the concrete surface several local peaks will appe...

Страница 18: ...IDX 2 00 0 1 2 00 IDX 1 1 Very suitable Suitable Not really suitable Not suitable Surface Deterioration 1 If INDX value ranges between 0 9 1 30 it is judged as unlikely surface deterioration 2 If INDX...

Страница 19: ...nges of STAT value and INDX value may not be observed In such case planar measurement is carried out and location of the delamination may be identified by extraction of location that the STR value is...

Страница 20: ...nstalling Installing Device Driver Insert the accompanying CD ROM into the PC Run the Install exe as administrator in DRIVER folder with right click DRIVER folder is in TUSBOE47 Although several dialo...

Страница 21: ...te the CTS02V4PC x64 exe file Wherever quickly accessible Fig 5 1 Contents of CD ROM 5 1 Startup CTS 02V4 PC program The initial screen is shown below See Fig 5 1 1 If the measured data exists in CTS...

Страница 22: ...et the parameters Timer Set To set the timer of CTS 02V4 Connect to CTS 02V4 To connect CTS 02V4 to the PC It will not be displayed when connected Show Parameter To check the parameters set in CTS 02V...

Страница 23: ...can be set using this dialog Fig 5 2 1 Dialog Window CONCRETE Select the measuring concrete is Normal or High Compressive by reference to Table 5 2 1 The parameters are different in Normal or High Com...

Страница 24: ...sured by hammering twenty times the data beyond the range if any will be excluded automatically from calculation of the mean score Since then the data beyond the range will not be obtained with restri...

Страница 25: ...the latter half of peak of the waveforms by impact force It is necessary to convert for estimation of the compressive strength of the concrete Please convert the compressive strength using the conver...

Страница 26: ...hanges of the numbers of the parameters Table 5 2 3 Explanation of Condition Items Purpose Mass of Hammer The weight of the hammer used should be entered The current weight is 380 g Sensitivity Sensit...

Страница 27: ...4 1 Please refer to the list of the name of button and its function as shown in Table 5 4 1 Present Date appeared is the date and time in internal clock for the PC not for that of CTS 02V4 YY MM DD H...

Страница 28: ...ng DATA Read button the data in the selected site number will be displayed in X Y N STR INDEX list box When clicking the coordinate number in X Y N STR INDEX list box the measured data will be display...

Страница 29: ...e and Index value are displayed at the top of the dialog shown in red box of Fig 5 5 3 1 These values are recalculated by the program of PC and may be different slightly from the measured values with...

Страница 30: ...will be saved shown on top of the screen Otherwise select the folder from the browser See Fig 5 5 4 2 available by clicking Ref button or create a new folder Fig 5 5 4 2 Screen of Browser The data cop...

Страница 31: ...surement number Fig 5 5 4 3 Data copied in PC 5 5 5 Deletion of Data When selecting the site number that you want to delete in Site Number list box and clicking Delete Site button a warning dialog wil...

Страница 32: ...ries ex manganese and alkaline batteries 6 2 Connection of Hammer Unit Although the instrument body and the hammer unit are already connected the hammer unit is removable Hold the grip firmly and with...

Страница 33: ...Once CTS 02V4 is started up information on version of measurement instrument date and time in the internal clock and parameters set up are displayed and then move to SITE selection screen See Fig 6 3...

Страница 34: ...of data can be recorded in each coordinate number Fig 7 1 1 Example of Display for USED Fig 7 1 2 Example of Display for EMPTY 7 2 Selection of Coordinate Number and Confirmation of Data When SITE num...

Страница 35: ...s a state of waiting for measurement the display will change from LOOKUP mode Fig 7 2 2 to MEAS mode Fig 7 3 1 In this state you can start hammering Fig 7 3 1 Waiting For Measurement Screen The data w...

Страница 36: ...ttled Please note that the data of the last waveform is not reflected in calculation of the mean score unless button is pressed When pressing button the screen will return to LOOKUP mode that the reco...

Страница 37: ...ruction 37 Fig 7 4 1 Screen of Deletion of Data Manufacturer Nitto Construction Co Ltd 1344 5 Oumu Town Oumu Monbetsu Hokkaido 098 1702 Japan Tel 81 158 84 2715 Fax 81 158 88 3031 E mail info nittoken...

Отзывы: