background image

2

41840-A McAlby Court, Murrieta, CA 92562

 (800) 451-9343,  www.nimbuswater.com

Congratula

ti

 ons on your purchase of the Nimbus CS-3 reverse osmosis system.  When properly maintained, this system will 

provide you with years of trouble-free service.   The next sec

ti

 ons contain important informa

ti

 on on the proper care and 

maintenance of your system, please take a few minutes to read through this informa

ti

 on.

The cartridges in this system must be replaced on a regular basis to maintain e

  ciency and to safeguard water quality.  

These cartridges work together to remove poten

ti

 al contaminants from your tap water and must be replaced every  6-12 

months.  Any signi

fi

 cant change in performance of the system should be inves

ti

 gated promptly to avoid secondary damage 

or deteriora

ti

 on to other parts of the system.

Introduc

ti

 on to the CS-3

Descrip

ti

 on

Replacement 

Interval

RO Membrane Desalinator

12 months

Pre-

fi

 lters

6-12 months

Post-Filter

12 months

In-line Carbon Filter

12 months

Tested at 60 psig (4 bar), 500ppm TDS municipal water, 77°F 
(25°C)

Feed Water Requirements

System Speci

fi

 ca

ti

 ons

Replacement Cartridges

Membrane

System w/Tank

Produc

ti

 on

36 GPD 
(136.3 LPD)

11.3 GPD 
(42.8LPD)

TDS Rejec

ti

 on 95%

95%

Pressure

40-80 psi (275 kPa - 552 kPa) 

Temperature

40°F - 100°F (4°C - 38°C)

TDS

<2000 mg/L

Chlorine

<1.0 mg/L

NTU

<1 

SDI

<5

pH

4-8

Feed water must be potable, municipal water.  Must be free 
of poten

ti

 al membrane foulants such as Iron, Hydrogen 

Sul

fi

 de and Manganese.

Содержание CS-3

Страница 1: ...A McAlby Court Murrieta CA 92562 800 451 9343 www nimbuswater com REV 0507 Nimbus CS 3 Reverse Osmosis System 05 09 41840 McAlby Court Suite A Murrieta CA 92562 800 451 9343 FAX 951 894 2801 www nimbuswater com ...

Страница 2: ...aced every 6 12 months Any significant change in performance of the system should be investigated promptly to avoid secondary damage or deterioration to other parts of the system Introduction to the CS 3 Description Replacement Interval RO Membrane Desalinator 12 months Pre filters 6 12 months Post Filter 12 months In line Carbon Filter 12 months Tested at 60 psig 4 bar 500ppm TDS municipal water ...

Страница 3: ...ge to the unit due to fire accident negligence act of God or events beyond the control of the Manufacturer are not covered by this warranty Incidental and Consequential Damages The Manufacturer does not assume responsibility for payment of incidental and consequential damages as a result of the failure of this unit to comply with express or implied warranties such as lost time inconvenience damage...

Страница 4: ...ems could result in water damage due to leaks or flooding Do not use with water that is microbiologically unsafe Typical Installation Diagram A Product water storage tank B Tank shut off valve C Tank tubing D Air gap faucet E Drain connection assembly F Drain tubing G Quick connect fitting H Product water tubing I Membrane desalinator J Carbon post filter K Carbon pre filter L Sediment pre filter M...

Страница 5: ...nection should be hand tightened only Push one end of product tubing into connection 7 Insert tubing and faucet assembly down through the sink hole 8 Position the faucet to the desired handle orientation Slip the slotted washer 1 between the white plastic spacer and the sink Securely hand tighten the mounting nut 9 Connect the 3 8 tubing to the drain saddle assembly using the drain connector nut s...

Страница 6: ...er Tighten all connections securely 6 Using the 1 4 tubing install the compression nut plastic ferrule and plastic tube insert Secure the tubing into the feed connector Tighten the tubing retaining nut securely 7 Obtain the small feed valve warning tag from the parts bag and attach it by its wire ties to the feed valve Drain Connection Note The drain saddle assembly must be installed before the P ...

Страница 7: ...nd plastic insert 2 Measure and cut the length of 1 4 tubing long enough to reach from the feed water supply to the inlet Connect the end to the feed inlet on the prefilter using a jaco nut and plastic insert See Fig 5 3 Connect one end of a 3 8 length of tubing to the tank valve Insert the other end firmly into the quick connect cross on the shut off valve 4 Connect the 1 4 tubing from the faucet ...

Страница 8: ...idge will release a small amount of carbon fines during the first tankful of flow This flushing procedure will allow any sanitizer or carbon fines to pass from the system 2 Initial tank filling will take approximately one hour based on average feed pressure When the tank is full the water pressure will have risen to the point where the automatic shut off valve inside the system will stop the feed f...

Страница 9: ...t and the drain saddle fitting the fitting attached to the sink drain pipe runs downhill to the drain There should be no loops or places where water would not flow out to the drain 5 Feed water valve is open 6 Within one to two hours after initial application of water pressure check again for leaks especially at the tank faucet tubing and connectors These parts will not see full pressure until app...

Страница 10: ...hut off valve 10 The system should be flushed at least once as described above under Section 8 Filter Replacement 1 Close the feed water shut off valve and close the tank shut off valve 2 Open the dispensing faucet to relieve system pressure Close dis pensing faucet when flow has stopped 3 Remove the prefilter housing by turning it clockwise when viewed from above Remove old prefilter from housing an...

Страница 11: ... fittings from the filter by using a wrench on the unscrew the fittings from the filter 4 To install the new filter first apply three wraps of teflon tape to the threads on the fittings then reverse the above steps 5 Turn on feed water shut off valve and open dispensing faucet 6 Close dispensing faucet after water starts running 7 Observe system for any leaks especially at newly replaced cartridge ...

Отзывы: