Scrub System
311
Service Manual – CS7000
11. Reinstall the
Scrub Deck
by following the above steps in reverse order.
Service Note:
When you reinstall the
Scrub Deck
:
• Make sure you reconnect the
Scrub Motors
to the correct
Electrical Connectors
in the wire harness as
follows:
–
Left scrub motor - White/Orange wire
–
Center scrub motor - Gray/Black wire
–
Right scrub motor - Blue/Yellow wire
• Make sure the two
Flange Bearings
are installed in the machine frame through holes, and that the
Bushings
and washers are installed correctly before installing the two
M12-1.75x 35mm Screws
.
•
You may find it easier to use a tapered punch or other suitable tool to align the
Bushings
,
Flange
Bearings
and
Deck Lift Arm Assembly
with the through holes in the frame before you install the
M12-1.75x 35mm Screws
.
Содержание CS7000 Fuel Cell EcoFlex
Страница 110: ...Electrical System 110 Service Manual CS7000 Electrical Panel Contactor Relay location Electrical Panel ...
Страница 147: ...Electrical System 147 Service Manual CS7000 56509170 Rev L Sheet 1 of 9 ...
Страница 148: ...Electrical System 148 Service Manual CS7000 56509170 Rev L Sheet 2 of 9 ...
Страница 149: ...Electrical System 149 Service Manual CS7000 56509170 Rev L Sheet 3 of 9 ...
Страница 150: ...Electrical System 150 Service Manual CS7000 56509170 Rev L Sheet 4 of 9 ...
Страница 151: ...Service Manual CS7000 151 Electrical System 56509170 Rev L Sheet 5 of 9 ...
Страница 154: ...Service Manual CS7000 154 Electrical System 56509170 Rev L Sheet 8 of 9 Before SN 1000048160 Kubota LPG before LEV E4 ...
Страница 155: ...Electrical System 155 Service Manual CS7000 56509170 Rev L Sheet 9 of 9 ...
Страница 172: ...Engine System LPG 172 Service Manual CS7000 Low LP Pressure Switch Fuel Tank Pressure relief valve Fuel Tank Area ...
Страница 357: ...Steering System 357 Service Manual CS7000 Steering System Wiring Diagram 36 V From Key Switch ...