
Nilan reserves the right to alter these instructions without prior notice
Page 3 af 15
Introduction
Please control that the following documents have been delivered together with the unit:
-
Directions for assembly & use (this document)
-
CTS 700 user guide
-
Electrical chart
Should you have any questions on how to operate the system, contact your nearest Nilan dealer,
who you can find at
www.nilan.dk/dealers
The purpose of this instruction manual is to offer the installation contractor and the user instruc-
tions on correct installation and maintenance of the Comfort system.
Comfort is a ventilation unit with heat recovery. The unit can yield up to 400m
3
/h at 100Pa external
back pressures. The energy in the exhaust air is being transferred to the inlet air.
The system is prepared for retrofitting of a post-heating element (electricity or water) for supply
heating of the inlet air. The post-heating element is controlled via CTS 700.
The unit is delivered with a G4 filter. In addition to this the unit can be equipped with different ac-
cessories e.g. hygrostat and filter box with pollen filter.
The plant has to be started immediately after installation and connection to the canal system.
When a ventilation plant is not running, the moist air from the rooms will be able to penetrate into
the channels and systems and allocate condensation. Condensation can run out of the valves and
damage furniture and floors. Condensed water in the plant may damage the electronics and the
fans.
Operating the unit is done with the CTS 700 control. The control has many functions such as menu
based attendance, week programme, time controlled filter guard and adjustment of the velocity of
the ventilator. (Directions for the CTS 700 control is described in another document delivered with
the unit.)
Comfort is delivered tested and ready for use. Installation and start-up must be carried out by an
authorized electrician.