Instructions for installation and start-up of the automation

This SECTION provides a step-by-step description of all phases of prod-
uct  installation  (mechanical  assembly,  electrical  connections,  testing)
and initial start-up (operating settings).

These phases are preceded by a number of very important instructions,
which regard safety, product characteristics and system feasibility.

1.1) Safety precautions and warnings

The  product  installation,  programming  and  start-up  procedures

must be performed exclusively by technically qualified personnel, in
observance  of  current  legislation  and  standards  governing  these
operations, and according to the instructions in this manual.
This manual has been drawn up to provide a step-by-step guide to
the procedures of installation, programming and start-up of the Soon
gearmotor.  All  tasks  required,  together  with  the  necessary  instruc-
tions,  are  specified  in  the  exact  order  in  which  they  must  be  per-
formed.
It  is  therefore  important  to  read  all  sections  of  the  manual  before
starting installation. We recommend in particular to carefully read the
Sections  containing  the  essential  information  on  SAFETY,  i.e.  this
Section  1,  Section  3  -  CHECKS  BEFORE  INSTALLATION  AND
PRODUCT  APPLICATION  LIMITS  and  Section  8  -  SYSTEM  TEST-
ING AND COMMISSIONING.
In consideration of the hazards that may arise during installation and
daily use of the product, installation must be in full observance of the
European  Directive  98/37/EC  (Machinery  Directive  governing  the
installation  of  power-operated  doors  and  gates)  and  in  particular
standards EN 12445, EN 12453 and EN 12635.
Compliance  with  this  Directive  will  enable  operation  in  maximum
safety, and the issue of the relative declaration of conformity at the
end of installation, with the consequent guarantee of system safety.

NOTE:

Further information and guidelines on the risk assessment,

useful when drawing up the “Technical Documentation” are available
on the Internet site: www.niceforyou.com
• Use of the Soon product other than as specified in this manual is

strictly prohibited. Improper use constitutes a risk of damage to the
product and a hazard to persons and objects.

• Never apply modifications to any of the product components, un-

less expressly specified in the manual. Unauthorised interventions
can lead to malfunctions and Nice

®

declines all liability for damage

caused by makeshift modifications to the product. 

• Before starting installation, an assessment of the associated risks

must be made, including a list of the essential safety requirements
as envisaged in Appendix I of the Machinery Directive, specifying
the  relative  solutions  adopted.  Note  that  the  risk  assessment  is
one of the documents included in the automation Technical docu-
menta-tion.

• Before starting installation, check whether other devices or mate-

rials are required to complete automation with Soon, evaluating the
specific application and associated risks; for example considering
the  risks  of  impact,  crushing,  shearing,  dragging  and  other  haz-
ards in general.

• Connect  the  Soon  control  unit  only  to  an  electric  power  line

equipped with an earthing system.

• During installation, prevent any parts of the automation from com-

ing into contact with water or other liquids, or penetration of these
liquids  and/or  objects  inside  the  control  unit  and  other  open  de-
vices. Should this occur, disconnect the power supply immediate-
ly and contact a Nice

®

service centre:

Use of Soon in these conditions constitutes a hazard!

• Never keep Soon components near to sources of heat and never

expose  to  naked  flames.  This  may  damage  system  components
and cause malfunctions, fire or hazardous situations

• During installation, all operations requiring access to internal parts,

concealed by the Soon cover (e.g. terminals) must be performed
with the power supply disconnected. If the connection is already
made  and  the  disconnection  devices  are  concealed,  a  suitable
notice  must  be  affixed,  indicating:  WARNING:  MAINTENANCE  in
PROGRESS:

• During  installation,  if  electrical  safety  device  trip,  such  as  circuit

breakers  or  fuses,  the  cause  of  the  fault  must  be  identified  and
eliminated before resuming normal operation.

• At the end of installation, the automation may only be used after

completing the “commissioning” procedure as specified in Section
8 - SYSTEM TESTING AND COMMISSIONING.

• In the event of prolonged periods of disuse, the optional battery of

Soon  should  be  removed  and  stored  in  a  dry  location.  This  pre-
caution  will  prevent  deterioration  and  the  risk  of  leakage  of  haz-
ardous substances from the battery.

• In  the  event  of  a  fault  not  remediable  with  the  information  in  this

manual, contact an authorised Nice

®

Service centre.

• The Soon product packaging material must be disposed of in full

observance of current local legislation governing waste disposal.

• Take care to conserve this manual to facilitate future maintenance

and interventions on the product.

!

!

1) Working in safety

2.1) Product description, intended use and technical data

2) Product specifications

SOON is an electromechanical operator for the automation of sec-
tional doors up to 20 m

2

. Thanks to the cable outlet shaft, it enables

simple  connection  with  the  spring  support  shaft  of  most  commer-
cially available sectional doors.
The SOA2 control unit, as well as powering the DC motor, enables
optimal control of the gearmotor torque and speed and precise mea-

surement of distances, gradual start-up and closure, and ob-stacle
detection. It is also equipped with a maintenance indicator to enable
recording of the manoeuvres performed by the gearmotor during its
lifetime.
The release mechanism, activated from the ground, disengages the
motor from the reduction unit.

Содержание Soon

Страница 1: ...ings for the fitter Istruzioni ed avvertenze per l installatore Instructions et recommandations pour l installateur Anweisungen und Hinweise f r den Installateur Instrucciones y advertencias para el i...

Страница 2: ...utomation The various sub jects are divided into three sections SECTION 1 is a step by step guide illustrating the phases re quired for physical installation of the product and operation start up SECT...

Страница 3: ...menta tion Before starting installation check whether other devices or mate rials are required to complete automation with Soon evaluating the specific application and associated risks for example co...

Страница 4: ...ell 3 Key operated selector switch 4 Post for photocell 5 Flashing light 6 Transmitter 7 Main edge Key to electric cables in Fig 3 A Electric power line B Flashing light with aerial C Photocells D Key...

Страница 5: ...1 Fig 4 a Insert the Soon outlet shaft in the sectional door drive shaft coupling them using the keys provided in the pack Perform this operation with the door CLOSED 2 Fig 4 b Secure the bracket to...

Страница 6: ...anual requires locking or release of the SOON mechanism Note The release or locking manoeuvres of the mechanism must be per formed exclusively with the gearmotor completely stationary The manual opera...

Страница 7: ...electric lock the FLASH output can be con nected to a 24V max 10W electric lock with latch versions with electromagnet only without electronic devices During the opening manoeuvre the electric lock is...

Страница 8: ...detec tors even not synchronised and enables the addition of other photo cells for example in the case of transit of heavy vehicles where a sec ond photocell is normally positioned at 1 m from the gr...

Страница 9: ...before proceeding Perform the following operations as specified and cross off the points as conformity of results is verified 6 Initial system start up checks 7 Memorising devices and positions 6 1 Op...

Страница 10: ...1 Led L2 remains lit Led L4 flashes Position RINT programming 7 If the intermediate slowdown position programming is not required press the key Set twice quickly to skip to the next programming led L4...

Страница 11: ...moving door are pro tected by means of impact force limitation measure the force as specified in the standard EN 12445 If speed and motor force controls are used as auxiliary functions with the syste...

Страница 12: ...the opening manoeuvre stops immediately after release of the photocells and automatic closure is activated with a pause of 5s The function Close After Photo is always disabled in manoeuvres interrupte...

Страница 13: ...e before automatic closure Applied only when auto matic closure function is enabled Sets the sequence of commands associated with the SS input or the 1st radio command Sets the motor speed during norm...

Страница 14: ...e not recommended to compensate for the fact that the leaf has anomalous points of friction excessive force may impair the safety system and damage the leaf If the Motor force control is used in suppo...

Страница 15: ...to L8 i e the input led associated with the parameter Fault log 4 Press and hold Set during steps 5 and 6 5 Wait approx 3s after which the leds corresponding to the manoeuvres subject to faults will...

Страница 16: ...erial terminal Fig 14 14 2 Move anyway function In the event that a safety device malfunctions or is out of service the gate may still be moved in hold to run mode For details refer to the paragraph C...

Страница 17: ...If no voltage is present this means that there is an electric overload on the output Check that there are no short circuits on the cable during the position memorisation phase led L1 or led L8 flashes...

Отзывы: