
3. Specifications
RH-PE
–
Mercury collection-tube reheating furnace for the PE-1 7
No.600-2113-03
3. Specifications
3.1.
Equipment specifications
Carrier gas
:Purified dry air (supplied from the PE-1)
Samples
:160L mercury collection tube
Dimensions and weight
:150 W x 177 D x 350 H mm, 6 kg
Power voltage
:Single phase 100 to 260 VAC, 50/60 Hz (3-pin socket)
Power capacity
:0.3 kVA
Power quality
:No surges, harmonics, noise, etc.
4. Installing the equipment
4.1.
Installation conditions
4.1.1.
Installation environment
Room temperature
:15°C to 35°C
Vibration
:Avoid any vibrations that the human body can strongly
sense.
Dust and dirt
:Maintain a clean atmosphere without any smoke, dust, or
other factors that can adversely affect measurements.
Please also refrain from smoking anywhere near.
Installation space
:A minimum area of 1,000 mm wide x 800 mm deep is
necessary. Ensure a firm foundation (without any wobble)
capable of bearing approximately 60 kg.
Others :Avoid
direct
exposure
to sunlight and air from air
conditioners, fans, etc.
Special notes
:Never place the equipment anywhere volatile
halogen-based reagents such as organochlorine solvents
are used. In addition, avoid anywhere such gases may be
present.
4.2.
Installation/connection
(1) Place the RH-PE to the left of the PE-1.
(2) Connect the supplied signal cable between the PE-1 and RH-PE.
(3) Connect the power cable to the RH-PE.
(4) Connect the supplied Teflon tubes (one yellow tube and one transparent tube) between the
PE-1 and RH-PE.
Yellow Teflon tube
transparent Teflon tube
Содержание Mercury/RH-PE
Страница 2: ......