Transport
VVM 310 should be transported and stored vertically in a dry
place.
However, the VVM 310 can be carefully laid on its back when
being moved into a building.
R
0
R
0
Assembly
•
Place VVM 310 on a solid foundation indoors that can take
its weight.
Use the product’s adjustable feet to attain a horizontal
and stable set-up.
30 - 50 mm
30 - 50 mm
15 - 40 mm
20-55 mm
•
The space where VVM 310 is located must be frost-free.
•
Because water can exit the safety valve
1
for hot water,
when connected to VVM 310, the space where VVM 310
is placed must be provided with a floor drain.
1 Not enclosed.
INSTALLATION AREA
Leave a free space of 800 mm in front of the product. All
service on VVM 310 can be carried out from the front.
800
10-25
50
50
NOTE
Leave 10 – 25 mm free space between VVM 310
and the wall behind for routing cables and pipes.
Supplied components
Room sensor
Outside sensor
LEK
LEK
LEK
Current sensor
LOCATION
The kit of supplied items is placed on top of the product.
7
Chapter 2 | Delivery and handling
NIBE VVM 310
Delivery and handling