2
3
4
4
Setting different operating modes (also with accessori-
es)
5
6
6
6
6
6
6
6
6
Available information and on-display settings
7
General points for the installation engineer
10
10
10
Guideline values for collectors
10
Inspection of the installation
10
Control (also with accessories)
11
11
14
Pipe connection (cooling medium)
14
Pipe connection (heating medium)
14
Pump capacity diagrams, heating medium side
14
Pump capacity diagrams, collector side
14
15
FIGHTER 1127 docked with an immersion heater and water
heater (floating condensing)
15
15
16
16
17
Connection of room temperature sensor RG-20
17
17
Connecting the supplied hot water temperature sensor with
floating condensing
18
Connecting supplied external circulation pumps
18
Connection of accessory VST 12
18
18
19
Filling and venting the brine system
19
Filling the heating/heating medium systems
20
20
Readjusting, heating medium side
20
20
Setting of heating/cooling automatic system
21
21
21
21
21
22
23
24
Dimensions and setting-out coordinates
28
29
29
30
Low room temperature during heating
31
High room temperature during heating
31
Low room temperature during cooling
31
Low room temperature during cooling
31
Low hot water temperature or no hot water
31
Helping the circulation pump to start
31
32
32
32
1
FIGHTER 1127
Table of Contents
Содержание FIGHTER 1127
Страница 2: ...LEK LEK LEK LEK LEK LEK LEK LEK LEK LEK...
Страница 26: ...Electrical circuit diagram FIGHTER 1127 24 Miscellaneous Technical specifications...
Страница 27: ...25 FIGHTER 1127 Miscellaneous Technical specifications...
Страница 28: ...FIGHTER 1127 26 Miscellaneous Technical specifications...
Страница 29: ...27 FIGHTER 1127 Miscellaneous Technical specifications...
Страница 35: ......