17
NIBE BA-SVM 10-200
Refrigerant connection pipeline
specification
BA-SVM 10-200/12
Gas pipe (Ø ext.)
Liquid line (Ø ext.)
Pipe dimensions
Ø15,88 mm (5/8”)
Ø9,52 mm (3/8”)
Connection
Connection – (5/8")
Connection – (3/8”)
Material
Copper quality SS-EN 12735-1 or
C1220T, JIS H3300
Minimum wall
thickness
1,0 mm
0,8 mm
External diameter,
copper pipe
(mm)
B, using the tool
R410A (mm)
B, using the
conventional tool
(mm)
Ø 9,52
0,0~0,5
0,7~1,3
Ø 15,88
Ø 6,35
1,0~1,5
Ø 12,7
External diameter,
copper pipe
(mm)
Tightening
torque
(Nm)
Tightening
angle (°)
Recommended
tool length
(mm)
Ø6,35
14~18
45~60
100
Ø 9,52
34~42
30~45
200
Ø12,7
49~61
30~45
250
Ø 15,88
68~82
15~20
300
Pipe connection
• Carry out the pipe installation when the service
valves (QM35, QM36) are closed.
AMS 10-6 / AMS 10-8
• Remove the side panel from AMS 10 during in-
stallation to facilitate access.
Flare connections
Expansion:
Ejection:
AMS 10-12
• Remove the “punch-out” part from the external
panel on the AMS 10 unit, where the pipes are
to be routed. The drawing below shows the pipe
outlets to choose from.
• Take care to ensure no water or pollutants enter the
refrigerant connection pipe. Pollutants in the pipes
risks damage to the heat pump.
• Bend the pipes with the maximum bending radi-
A
B
Vacuum
pump
Manometer
Zawór serwisowy,
ciecz
Zawór serwisowy,
gaz
W
yjści
e pomiarowe
Manometr
Pompa
pró
żniowa
A
B
Vacuum
pump
Manometer
Zawór serwisowy,
ciecz
Zawór serwisowy,
gaz
W
yjści
e pomiarowe
Manometr
Pompa
pró
żniowa
CAUTION
Gas shielding must be used when soldering.
External diameter,
copper pipe
A (mm)
Ø 6,35
9,1
Ø 9,52
13,2
Ø 12,7
16,6
Ø 15,88
19,7
BA-SVM 10-200/12
BA-SVM 10-200/6
us (at least R100~R150). Do not bend the pipes
repeatedly. Use a bending machine.
• Make and connect the flare-connection and tighten
with the appropriate torque using a torque wrench.
Use the appropriate tightening angle, if a torque
wrench is not available.
BA-SVM 10-200/6
Gas pipe (Ø ext.)
Liquid line (Ø ext.)
Pipe dimensions
Ø12,7 mm (1/2”)
Ø6,35 mm (1/4”)
Connection
Connection – (1/2")
Connection – (1/4”)
Material
Copper quality SS-EN 12735-1 or
C1220T, JIS H3300
Minimum wall
thickness
1,0 mm
0,8 mm
Section 4 |
Pipe connections
Front
Elements to be removed
Содержание BA-SVM 10-200 Series
Страница 2: ......
Страница 86: ...86 NIBE BA SVM 10 200 ...
Страница 87: ......
Страница 88: ...NIBE Group Hannabadsvägen 5 285 32 Markaryd Sweden www nibe eu ...