Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person. Fill in the page for information about installation data in the User
manual.
Date
Signature
Notes
Description
✔
Brine
System flushed
System vented
Shut off valves
Electricity
Fuses air collector module
Fuses property
Ambient sensor
Control unit
Safety breaker
Earth circuit-breaker
Miscellaneous
Docked to
3
Chapter 1 |
Important information
AMB 30
Содержание AMB 30
Страница 1: ...Installer manual LEK AMB 30 Accessories F1345 IHB GB 1341 1 231417 ...
Страница 2: ......
Страница 47: ...Electrical circuit diagram 45 Chapter 12 Technical data AMB 30 ...
Страница 48: ...AMB 30 Chapter 12 Technical data 46 ...
Страница 49: ...47 Chapter 12 Technical data AMB 30 ...
Страница 51: ......
Страница 52: ...NIBE AB Sweden Hannabadsvägen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 231417 ...