Transport and storage
GreenMaster-HP comes complete in assembled version
with a base frame permanently installed under the heat
pump section. On request, the unit can be supplied
without the liquid filled to allow easy dismantling and
reinstallation in properties where the transport route is
narrow, or where it is not possible to make holes to lift
in the unit. For further details, see under
sion due to narrow transport routes
Loading, unloading and transport on site are managed
using forklift trucks, pallet trucks or cranes. Suitable lift-
ing straps must always be used.
The unit should be transported in the upright position
or at an incline of less than 30°.
Unloading and lifting with forklift truck or
pallet truck
The truck’s forks must be long enough to ensure there
is no risk of the unit’s underside being damaged. Make
sure that the forks reach through to the other side of
the unit.
Unloading and lifting with crane
If the unit comes on a pallet, it must be lifted off using
straps.
A unit that comes with the machine feet already fitted
has to be lifted with the straps on the inside of the ma-
chine feet and with the straps securely tightened.
A unit that come without machine feet has to be lifted
using flat beams and with the straps securely tightened.
The lifting beams have to be positioned so there is no
risk of the unit falling. Ensure that the beams are strong
enough to lift the load, and that the straps are not in
contact with and damaging the unit’s upper section. Use
beams or a lifting yoke to keep the straps away from the
unit’s upper section.
Storage before installation
The unit must be protected against the weather and
impacts. The packaging must be removed and the unit
covered with a tarpaulin or similar. To ensure that there
is as little condensation as possible, good circulation
must be guaranteed between the protective cover and
the unit.
Separable version due to narrow transport
routes
If the unit is to be moved into a fan room in properties
where the transport route is narrow, or where it is not
possible to make holes to allow lifting in, the unit can
be supplied without the refrigerant. This means that the
unit can be split into six parts and a base frame.
To split up the unit, read and follow the instructions un-
der Dismantling and assembly on page 9.
The weight of each part can be found in the relevant
unit specification for the installed unit.
Assembly
The surface below the unit has to be flat enough so the
unit’s final position is, and will remain, completely hori-
zontal. Using the machine feet, the frame can be adjus-
ted so the unit attains a horizontal position. The surface
must withstand the load from the unit. If the installation
uses lightweight structures or has especially sensitive
areas, the unit should be placed on a vibration-absorbing
base with the necessary properties.
Caution
Ducts must be insulated against vibrations and
noise, and must not be mounted directly on
beams, beam joints or other critical building
components.
Set-up for outdoor installation
The unit has no drip mouldings between unit and under-
carriage. A local fitter must install additional protection
and insulation for the frame, to ensure that water does
not run down under the unit. NIBE AirSite design as-
sumes that the unit is installed on a sealed roof, which
is not at risk of moisture damage due to drainage from
the condensate drip tray or external moisture such as
rain or snow.