Fitting your Shower

4

NEWTEAM 1500-XT

In addition to the recommendation on `Planning your Installation’ please take note of

the following:

• All plumbing should be completed before any electrical connections are undertaken.

• The unit can be connected to a combination cylinder system providing it 

has a cold water storage capacity of 115 litres (25 gallons actual).

• When connecting pipework avoid using elbows: sweep or formed bends will 

ensure optimum performance.

• Do not solder within 300mm of the unit.

• Do not run pump dry this will damage the internal seal and invalidate the warranty.

• All pipework to and from the unit should be a minimum of 15mm. Non-restrictive

isolating valves must be fitted on hot and cold supply pipes.

• Do not position unit in areas subjected to freezing conditions.

• The temperature of your stored water must not exceed 65ºC. A stored water 

temperature of 60ºC is considered sufficient to meet all normal requirements 

in line with the British Standard 6700.

WARNING – ALL CONNECTING PIPEWORK SHOULD BE EARTHED

Procedure - Plumbing Connections: Fig 1.

1. Isolate mains water and electrical supplies.

2. To empty the pipework open the hot and cold water taps.

3. Make your connection into the hot water supply pipe from the cylinder, ensuring 

that it is the first draw-off (below the expansion pipe tee) to minimise the effects 

of water draw offs elsewhere in the house, and a minimum of 1 metre from the 

base of the cold storage tank and the expansion tee.

4. If this is not possible, a direct connection must be made from the hot water 

cylinder with a cylinder flange, Fig 2.

5. The cold water supply should be taken directly from the cold storage tank, 

and must be positioned 60mm below the cold feed connection to the hot 

water cylinder. This should not be directly beneath the ball valve as aeration of the

water going to the shower could cause pump damage.

6. Run hot and cold pipework to the unit position.

We recommend that the unit is fitted at chest height, and set to one side of the

intended riser rail position, ensuring that the top of the unit is at least 75mm below

the base of the cold water tank.  

IMPORTANT:

• The unit must be fitted on the finished tiled surface.

Do not seal the edge of the unit to the tiled surface with any sealant,

as the 

gap below the back of the unit and the tiles is needed for ventilation.

• The outlet connection must be positioned at the bottom of the unit.

General

The Unit

Fig 2 - Cylinder Flange

1m

Minimum

Содержание 1500-XT

Страница 1: ...BOOKLET FOR FUTURE REFERENCE NEWTEAM 1500 XT THERMOSTATIC POWER SHOWER DEAR INSTALLER WHEN YOU HAVE READ THESE INSTRUCTIONS PLEASE ENSURE YOU LEAVE THEM WITH THE USER IN THE EVENT OF ANY QUERY PLEASE...

Страница 2: ...Product Features 1 NEWTEAM 1500 XT NewTeam 1500 XT Integral pump Push fit fittings 3 spray massage handset Thermostatic control BEAB approval of safety 255mm 240mm...

Страница 3: ...SSIONING Refer to back cover for Guarantee Customer Service and Replacement Parts Policy In the event of any query regarding installation please contact the NewTeam Customer Service Department Tel 015...

Страница 4: ...wer must comply with the current I E E Regulations which includes earth cross bonding to all metal pipework IMPORTANT All plumbing should be completed before final electrical connections are made The...

Страница 5: ...the pipework open the hot and cold water taps 3 Make your connection into the hot water supply pipe from the cylinder ensuring that it is the first draw off below the expansion pipe tee to minimise th...

Страница 6: ...for correct installation Fig 3 Fixing points 1500 XT Collet Fig 4 Push fit fittings Cold Hot Removal of Front Cover and Control Knobs Please note that this product comes packaged with the front cover...

Страница 7: ...nd insert the mains wiring through the aperture at the top of the base moulding Ensure that the supply pipes are fully inserted into the mixer valve push fit connections and fix the unit to the wall 8...

Страница 8: ...wall to indicate the upper fixing screw position Screw centres are 605 mm approx 23 inches apart Drill the wall at the marked fixing position using a 6 mm drill and loosely fix the rail end checking...

Страница 9: ...ting valves and the electricity isolating switch and place the open end of the shower hose in the shower tray or bath 3 Set the temperature control knob to cold fully clockwise and press the Stop Star...

Страница 10: ...Do not at anytime use bath cleaning liquids powders or specified scratch cleaners on any surface finishes In order to avoid surface wear or chemical attack on any of your shower fittings when cleaning...

Страница 11: ...ong Inlet Elbow x2 not shown 9 SP 087 0091 TPE Cover 10 SP 087 0154 Mixer Valve Complete 11 SP 087 0505 Temperature Control Knob 12 SP 087 0503 Start Stop Button 13 SP 087 0504 Shower Boost Button 14...

Страница 12: ...Installer Notes 11 NEWTEAM 1500 XT...

Страница 13: ...Installer Notes 12 NEWTEAM 1500 XT...

Страница 14: ...tory rights Service Policy Replacement Parts Policy IMPORTANT In the event of product or component malfunction DO NOT tamper with or remove the product from site Telephone NewTeam Customer Service Dep...

Страница 15: ..._ 3 If the product is a replacement shower please state the type and make of the shower it is replacing ____________________________________________________________________________ 4 What influenced y...

Страница 16: ...NewTeam Ltd Customer Service Dept Brunel Road Earlstrees Industrial Estate Corby Northants NN17 4JW 1st Fold 2nd Fold 3rd Fold Please tape down Please tape down Affix Stamp...

Отзывы: