NewTeam 1500-XT Скачать руководство пользователя страница 3

Contents

2

NEWTEAM 1500-XT

Please read this booklet carefully and ensure a competent person undertakes the

installation.

Note: Following the headings in sequence will guide you through the installation

and operation of your NewTeam 1500-XT Power Shower.

PLANNING YOUR INSTALLATION

• Plumbing 

• Electrics

FITTING YOUR SHOWER

• 

General 

• 

The Unit

• Water/Electrical Connections 

• 

Surface Mounting 

• 

Recessed Fitting Pipework 

• Riser Rail

USER INSTRUCTIONS

COMMISSIONING

Refer to back cover for Guarantee, Customer Service and Replacement Parts Policy.  

In the event of any query regarding installation please contact the NewTeam Customer

Service Department 

Tel: 01536 264 012 • Fax: 01536 409 201

E-mail: [email protected] • E-mail: [email protected]

In line with our policy of continual product development the specifications may be 

varied and product design altered.  We reserve the right to depart from the details

given in this manual without prior notice.

3

Pages

4 - 7

8

9

Installation and Operating Instructions 

for NewTeam Power Shower

• 1500-XT

SPARE PARTS LISTING

10

INSTALLER NOTES

11-12

GUARANTEE

13

Содержание 1500-XT

Страница 1: ...BOOKLET FOR FUTURE REFERENCE NEWTEAM 1500 XT THERMOSTATIC POWER SHOWER DEAR INSTALLER WHEN YOU HAVE READ THESE INSTRUCTIONS PLEASE ENSURE YOU LEAVE THEM WITH THE USER IN THE EVENT OF ANY QUERY PLEASE...

Страница 2: ...Product Features 1 NEWTEAM 1500 XT NewTeam 1500 XT Integral pump Push fit fittings 3 spray massage handset Thermostatic control BEAB approval of safety 255mm 240mm...

Страница 3: ...SSIONING Refer to back cover for Guarantee Customer Service and Replacement Parts Policy In the event of any query regarding installation please contact the NewTeam Customer Service Department Tel 015...

Страница 4: ...wer must comply with the current I E E Regulations which includes earth cross bonding to all metal pipework IMPORTANT All plumbing should be completed before final electrical connections are made The...

Страница 5: ...the pipework open the hot and cold water taps 3 Make your connection into the hot water supply pipe from the cylinder ensuring that it is the first draw off below the expansion pipe tee to minimise th...

Страница 6: ...for correct installation Fig 3 Fixing points 1500 XT Collet Fig 4 Push fit fittings Cold Hot Removal of Front Cover and Control Knobs Please note that this product comes packaged with the front cover...

Страница 7: ...nd insert the mains wiring through the aperture at the top of the base moulding Ensure that the supply pipes are fully inserted into the mixer valve push fit connections and fix the unit to the wall 8...

Страница 8: ...wall to indicate the upper fixing screw position Screw centres are 605 mm approx 23 inches apart Drill the wall at the marked fixing position using a 6 mm drill and loosely fix the rail end checking...

Страница 9: ...ting valves and the electricity isolating switch and place the open end of the shower hose in the shower tray or bath 3 Set the temperature control knob to cold fully clockwise and press the Stop Star...

Страница 10: ...Do not at anytime use bath cleaning liquids powders or specified scratch cleaners on any surface finishes In order to avoid surface wear or chemical attack on any of your shower fittings when cleaning...

Страница 11: ...ong Inlet Elbow x2 not shown 9 SP 087 0091 TPE Cover 10 SP 087 0154 Mixer Valve Complete 11 SP 087 0505 Temperature Control Knob 12 SP 087 0503 Start Stop Button 13 SP 087 0504 Shower Boost Button 14...

Страница 12: ...Installer Notes 11 NEWTEAM 1500 XT...

Страница 13: ...Installer Notes 12 NEWTEAM 1500 XT...

Страница 14: ...tory rights Service Policy Replacement Parts Policy IMPORTANT In the event of product or component malfunction DO NOT tamper with or remove the product from site Telephone NewTeam Customer Service Dep...

Страница 15: ..._ 3 If the product is a replacement shower please state the type and make of the shower it is replacing ____________________________________________________________________________ 4 What influenced y...

Страница 16: ...NewTeam Ltd Customer Service Dept Brunel Road Earlstrees Industrial Estate Corby Northants NN17 4JW 1st Fold 2nd Fold 3rd Fold Please tape down Please tape down Affix Stamp...

Отзывы: