Planning your Installation 

3

NEWTEAM 1500-XT

Plumbing

Under no circumstances should the unit be connected directly to the mains 

cold water supply, or to a combination boiler, or pressurised hot water system.

For correct operation of the NewTeam 1500-XT power shower, both hot and cold

water supplies must be gravity fed, at nominally equal pressures, from  a  cold water

storage tank, and a hot water storage cylinder.

We recommend a minimum of 115 litres (25 gallon actual) of cold water 

supplied by a storage tank. Please ensure compliance with all Water 

Regulations. 

Under no circumstances must the Power Shower be connected to the

mains cold water supply.

Please ensure maximum supply head of 10 metres, minimum 1 metre.

It is recommended that the hot water supply is at a temperature of 60ºC, in line with

British Standard 6700, British Water Regulations, and Plumbing Code of Practice.

Do not use jointing compounds when connecting, and do not solder within 300mm

of the unit.

Before proceeding with the installation of this unit, check that your site requirements

allow the handset to be a minimum of 1 metre below the bottom of the cold water

storage tank to allow the 1500-XT to also operate on gravity.

WARNING: THIS APPLIANCE MUST BE EARTHED.

All electrical wiring for the shower must comply with the current 

I.E.E Regulations which includes earth-cross bonding to all metal pipework.

IMPORTANT:

All plumbing should be completed before final electrical connections are made.

The shower must be connected to a 230/240 volt A.C electrical supply from a 

13-amp ring main, via a fused double pole switch with at least 3mm contact 

separation. The switch is to be clearly identifiable, a minimum distance of 2.5m from

a fixed tap or shower, i.e. mounted in an adjacent room or via a ceiling-type pull cord

switch. The unit should be fused at no more than 3 amps.

This appliance must be earthed, and all associated metal pipework earth 

crossbonded in line with current I.E.E regulations.

As the colours of the wires in the cable (not supplied) used to connect to this 

appliance may not correspond with the coloured markings identifying the terminals

in your switch, please follow the procedure below:

Please use the cable entry point provided. Failure to comply will eliminate any 

BEAB approval.

Procedure:

•  The wire, which is coloured Blue or Black, must be connected to the terminal that

is marked with the letter N.

•  The wire, which is coloured Brown or Red, must be connected to the terminal that

is marked with the letter L.

•  The wire which is coloured Yellow/Green must be connected to the terminal which

is marked with the earth symbol    .

•  The installation and wiring must comply with I.E.E regulations.

Electrics

Fig. 1 – Gravity Power Shower Installation

1m

Minimum

60mm

Содержание 1500-XT

Страница 1: ...BOOKLET FOR FUTURE REFERENCE NEWTEAM 1500 XT THERMOSTATIC POWER SHOWER DEAR INSTALLER WHEN YOU HAVE READ THESE INSTRUCTIONS PLEASE ENSURE YOU LEAVE THEM WITH THE USER IN THE EVENT OF ANY QUERY PLEASE...

Страница 2: ...Product Features 1 NEWTEAM 1500 XT NewTeam 1500 XT Integral pump Push fit fittings 3 spray massage handset Thermostatic control BEAB approval of safety 255mm 240mm...

Страница 3: ...SSIONING Refer to back cover for Guarantee Customer Service and Replacement Parts Policy In the event of any query regarding installation please contact the NewTeam Customer Service Department Tel 015...

Страница 4: ...wer must comply with the current I E E Regulations which includes earth cross bonding to all metal pipework IMPORTANT All plumbing should be completed before final electrical connections are made The...

Страница 5: ...the pipework open the hot and cold water taps 3 Make your connection into the hot water supply pipe from the cylinder ensuring that it is the first draw off below the expansion pipe tee to minimise th...

Страница 6: ...for correct installation Fig 3 Fixing points 1500 XT Collet Fig 4 Push fit fittings Cold Hot Removal of Front Cover and Control Knobs Please note that this product comes packaged with the front cover...

Страница 7: ...nd insert the mains wiring through the aperture at the top of the base moulding Ensure that the supply pipes are fully inserted into the mixer valve push fit connections and fix the unit to the wall 8...

Страница 8: ...wall to indicate the upper fixing screw position Screw centres are 605 mm approx 23 inches apart Drill the wall at the marked fixing position using a 6 mm drill and loosely fix the rail end checking...

Страница 9: ...ting valves and the electricity isolating switch and place the open end of the shower hose in the shower tray or bath 3 Set the temperature control knob to cold fully clockwise and press the Stop Star...

Страница 10: ...Do not at anytime use bath cleaning liquids powders or specified scratch cleaners on any surface finishes In order to avoid surface wear or chemical attack on any of your shower fittings when cleaning...

Страница 11: ...ong Inlet Elbow x2 not shown 9 SP 087 0091 TPE Cover 10 SP 087 0154 Mixer Valve Complete 11 SP 087 0505 Temperature Control Knob 12 SP 087 0503 Start Stop Button 13 SP 087 0504 Shower Boost Button 14...

Страница 12: ...Installer Notes 11 NEWTEAM 1500 XT...

Страница 13: ...Installer Notes 12 NEWTEAM 1500 XT...

Страница 14: ...tory rights Service Policy Replacement Parts Policy IMPORTANT In the event of product or component malfunction DO NOT tamper with or remove the product from site Telephone NewTeam Customer Service Dep...

Страница 15: ..._ 3 If the product is a replacement shower please state the type and make of the shower it is replacing ____________________________________________________________________________ 4 What influenced y...

Страница 16: ...NewTeam Ltd Customer Service Dept Brunel Road Earlstrees Industrial Estate Corby Northants NN17 4JW 1st Fold 2nd Fold 3rd Fold Please tape down Please tape down Affix Stamp...

Отзывы: