SECTION 4 - MAINTENANCE
4-5
MAINTENANCE SCHEDULE
NOTE:
The items listed at the first 5 hours and first 50 hours are very important. If they are not performed, it could
cause early failures of components and severely lower the life expectancy of the unit.
DESCRIPTION
AFTER
FIRST 5
HOURS
EVERY 10
HOURS
OR DAILY
EVERY 50
HOURS OR
WEEKLY
EVERY 400
HOURS OR
YEARLY
Inspect and tighten hardware
X
Check reel drive belt tension
X
X
Check reel drive chain tension
X
X
Check sickle drive belts tension
X
X
Check wheel bolts – 150 N
⋅
m (115 ft. lbs.)
X
X
Check tire pressure – 193 kPa (28 psi)
X
Check cutter bar guards, knife sections, and repair as
needed
X
Check conditioner roll clearance
X
X
Check conditioner roll timing
X
Содержание Haybine 499
Страница 1: ... 5HSODFHV OO 3UHYLRXV VVXHV ...
Страница 2: ... 1 PHULFD ...
Страница 28: ...SECTION 1 GENERAL INFORMATION 1 18 ...
Страница 50: ...SECTION 2 OPERATION 2 22 ...
Страница 60: ...SECTION 3 LUBRICATION 3 10 ...
Страница 71: ...SECTION 4 MAINTENANCE 4 11 9 Tighten bolts 1 and nuts 2 10004725 1 1 2 12 ...
Страница 110: ...SECTION 4 MAINTENANCE 4 50 ...
Страница 114: ...SECTION 5 TROUBLESHOOTING 5 4 ...
Страница 122: ...SECTION 7 SPECIFICATIONS 7 4 ...
Страница 126: ...7 8 ...
Страница 128: ...7 10 ...