
Site Selection:
Select a safe site to install the CPE.
The distance between any power lines and the installation site should be at least one and one-half times the
height of the CPE and mast assembly. Make the distance even greater, if at all possible. Since all overhead
power lines look somewhat alike, consider them all dangerous and stay well away from them.
If you have power lines in the area, call your local electric utility for assistance.
CPE Mounting:
NEVER work alone; always have someone near who can summon help.
Certain clothing may provide a degree of safety, but don't depend on it for your life (rubber boots or shoes,
industrial rubber gloves and a long sleeve shirt or jacket).
Check weather conditions. Be sure that it hasn't rained recently and that the lawn is not wet or muddy. Make
sure that rain or thunderstorms are not predicted for the day you decide to install the CPE.
The wind can blow the CPE into a nearby power line. Don't install or remove CPE in moderate or heavy winds.
If you need to use a ladder, make sure it is made of non-conductive (non-metallic) material. (This is a safety rule
that you should follow whenever you're working with electrical equipment.)
If possible, have someone present who has been trained in electric shock first aid.
CPE Installation:
Properly assemble the CPE according to instructions (do this where the CPE is to be put up).
Once the CPE is up in full vertical position, securely fasten it by tying it to the side of the house or by using “guy”
wires.
Ground the CPE according to the National Electrical Code.
Rooftop Installations:
DO NOT assume that just because you're on a roof, you're isolated from ground. You may still be electrocuted or
fall off the roof.
Important Notes
Read all instructions prior to installing any of the enclosed equipment. Pay particular attention to the
warnings associated with the installation of the CPE.
It is highly recommended that the installation of this equipment is done by a trained professional if you are
not experienced with installation of communications equipment.
Tampering with or breaking the seal on Netkrom CPE Unit back plate voids any warranty coverage on the
CPE and will result in full equipment charge to the customer.
Pag 2
Содержание AIRNET 11Mb CPE BRIDGE
Страница 1: ...AIRNET 11Mb CPE BRIDGE Installation Guide ...