background image

These instructions show how to build a 4m x 4m walk fruit and veg walk-in 
cage. This is for example purposes only and might not match the size you have 
ordered. However, the cage is modular and uses the same universal 
components, so the principle of building your cage is exactly same (whatever 
size you order).  

Before assembling this product, we strongly recommend you familiarise 
yourself with the instructions and take time to check that all parts are present 
and undamaged. Make sure you have the correct tools to build your fruit cage.

Introduction

I M P O R TA N T

SAFETY NOTICE

■ To be installed by adults only, keep children and pets away from the cage    

when installing. 

Tools Required 

■ Keep the working area free of tools and parts and other obstructions/trip 

hazards.

■ Take care when carrying and using tools (especially scissors).

■ Tape measure, string line or line marking paint, spirit level, mallet, adjustable 

spanner, step ladder and scissors.

■ We recommend using a step ladder when working at heights.

■ Always use stabilisers, or get someone to stand at the bottom of the ladder.  

■ Identify a safe, legal and suitable area for the cage to be installed, make sure 

the area is free from underground cables and pipes.  

■Make sure you are well balanced from start to finish of an operation. 

■ Always reposition a ladder to avoid the risk of overbalancing. 

■ Ladders should be placed on a firm and level surface.

General

■ For heavy items or working at a height always use a sufficient amount of 

people.

Step Ladder

Assembly must be carried out by a sufficient amount of people using due 
diligence and risk assessment. Never try to assemble large or heavy 
products with insufficient personnel.

■ Never overreach when working on a ladder or steps. 

Содержание Harrier Walk-In Fruit & Veg Garden Cage

Страница 1: ...arrier Walk In Fruit Veg Garden Cage Assembly Instructions www networldsports co uk 44 0 1691 683 807 cs networldsports co uk www networldsports com 1 866 861 9095 cs networldsports com NetWorldSports...

Страница 2: ...trip hazards Take care when carrying and using tools especially scissors Tape measure string line or line marking paint spirit level mallet adjustable spanner step ladder and scissors We recommend usi...

Страница 3: ...ke x4 Ground Peg x8 Tube x8 Name Part QTY 3 Way Connector x2 Ground Spike x4 Ground Peg x8 Tube x8 Corner Extender Kit Name Part QTY Connector 4 Way x1 Ground Spike x1 Ground Peg x4 Tube x3 Door Kit N...

Страница 4: ...itioning for the fruit cage s ground spikes make sure they are in line spaced evenly and set at a consistent height Take all measurements from the centre of these tubes Mark out the length of your fru...

Страница 5: ...n is once again locked into the tubes hole Repeat this step for the tube perpendicular to this one SEE FIG5 Secure the 3 way 4 way connectors with a horizontal tube Push the tube into the ends of both...

Страница 6: ...framework to the required size and shape Attach a 5 way connector from corner extender kit to the centre tube once locked into place attach horizontal tube into 4 way connector then into 5 way connec...

Страница 7: ...e locks into the tube holes Door Installation The door kit includes 2 qty x door upright tubes with ttings This allows you to position the door in any location around the fruit cage Door Upright Posit...

Страница 8: ...Doors can add extra weight to your cage therefore 2 support bars are included with every door kit you can position these where desired to add rigidity the door are of your cage the diagram FIG13 show...

Страница 9: ...he roof is covered Start off with the roof net panels In this example 4m x 4m The roof net is supplied in X2 2m x 4m panels attach each corner of the net to the corner connectors using cable ties Once...

Страница 10: ...mately 4 pegs in every 2m bay SEE FIG17 Maintenance advice Although the steel components have been treated if you see any chipped paintwork we suggest touching it up with paint to help prevent corrosi...

Отзывы: