2m
FIG17
FIG18
What to do in Door areas
The side netting will need to be cut down with
scissors to allow space for the door(s). Each door is
supplied with a net panel that simple cables ties to
the frame
(SEE FIG 18)
Ground Pegs
Pull down the netting until tight, and peg down
using the ground pegs, we advise positioning
approximately 4 pegs in every 2m bay.
(SEE FIG17)
Maintenance advice
Although the steel components have been treated if you see
any chipped paintwork we suggest touching it up with paint to
help prevent corrosion.
If you are not using the cage in the winter we recommend
taking it down and store inside to prolong its life. If you are
using the cage in the winter we suggest removing the roof
netting to prevent damage to the framework caused by
snowfall, or you may wish to replace the net with bigger mesh
netting like 50mm/75mm/100mm.