![Neousys Technology Nuvo-7000 Series Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/neousys-technology/nuvo-7000-series/nuvo-7000-series_user-manual_1667820041.webp)
41
2.2.8
Reset Button
The reset button is used to manually reset the system in case of system halt or
malfunction. To avoid unexpected reset, the button is purposely placed behind the panel.
To reset, please use a pin-like object (eg. tip of a pen) to access the reset button
2.2.9
LED Indicators
There are four LED indicators on the I/O panel: IGN, WDT, HDD and PWR. The
descriptions of these four LED are listed in the following table.
Indicator
Color
Description
IGN
Yellow
Ignition signal indicator, lid when IGN is high (12V/ 24V).
WDT
Yellow
Watchdog timer LED, flashing when WDT is active.
HDD
Red
Hard drive indicator, flashing when hard disk drive is active.
PWR
Green
Power indictor, lid when system is on.
Содержание Nuvo-7000 Series
Страница 1: ...Neousys Technology Inc Nuvo 7000 Series User Manual Revision 1 3...
Страница 15: ...15 For sub zero operating temperature a wide temperature HDD or Solid State Disk SSD is required...
Страница 23: ...23 1 2 3 Nuvo 7000E P Top View...
Страница 24: ...24 1 2 4 Nuvo 7000E P Bottom View...
Страница 26: ...26 1 3 3 Nuvo 7000DE Top View...
Страница 27: ...27 1 3 4 Nuvo 7000DE Bottom View...
Страница 29: ...29 1 4 3 Nuvo 7000LP Top View...
Страница 30: ...30 1 4 4 Nuvo 7000LP Bottom View...
Страница 65: ...65 3 On the front I O panel remove the hexa screws indicated below Nuvo 7000E P DE systems Nuvo 7000LP systems...
Страница 66: ...66 4 Remove the front I O panel Nuvo 7000E P DE systems Nuvo 7000LP systems...
Страница 67: ...67 5 On the rear I O panel remove the hexa screws indicated below Nuvo 7000E P DE systems Nuvo 7000LP systems...
Страница 68: ...68 6 Remove the rear I O panel Nuvo 7000E P DE systems Nuvo 7000LP systems...
Страница 70: ...70 8 Once the bottom panel has been removed you should have access to the system s internal I O interfaces...
Страница 86: ...86 2 The MezIO TM module is secured by the three stand mounts indicated in the illustration below...
Страница 102: ...102 2 Install the front panel and secure screws indicated in blue Nuvo 7000E P DE systems Nuvo 7000LP systems...
Страница 103: ...103 3 Install the rear panel and secure screws indicated in blue Nuvo 7000E P DE systems Nuvo 7000LP systems...
Страница 104: ...104 4 Install the Cassette module and secure screws indicated in blue NOTE Not applicable to Nuvo 7000LP systems...
Страница 106: ...106 3 when wall mounting place the heatsink fins perpendicular to the ground for better heat dissipation efficiency...
Страница 139: ...139 8 The Name option allows you to name your RAID volume Press ENTER when ready to go to the next option...
Страница 153: ...153 7 Follow the 6 step setup procedure as instructed...
Страница 154: ...154 8 Check the I accept the terms in the License Agreement box and click on Next to continue the installation process...
Страница 155: ...155 9 When done click on Finish and restart the system...