Floor drying program
Floor drying screen (Fig.
) is divided into two parts, the left for adjusting and the right for control.
Five time periods can be selected in the table on the left of the screen, while the output water temperature and time range
for which the temperature is to be maintained, can be selected for each period. The individual time slots follow each other,
and after entering the end time of one section, the start time of the next section is automatically adjusted. The total time of
�
oor drying can be up to
�
8
�
hours.
At the top right of the screen, there is
, which shows how many hours of the
�
oor drying process have
passed and the currently set output water temperature.
There are two switches under this information. The switch
activates the
�
oor drying process. With the same
switch, the running process can be paused and restarted. The second switch
timer resets the
�
oor drying process
timer and can be restarted.
Figure
�
.
�
: Service access section
�
�
Floor drying process
Drying
�
oors with the heat pump in winter can only be started when the return water temperature exceeds
��
°
C. Other-
wise, if you do not have another heat source, you must use a built-in or external electric boiler.
Failure to follow this advice will cause the heat pump to malfunction and it can result in damage.
The drying program in the heat pump is only a tool to simplify the drying process. When drying, it is always necessary
to comply with the requirements of the
�
oor technology supplier (
�
oor screeds,
�
oor coverings, etc.). It is also necessary
to monitor the humidity level in the building so that it cannot result in damage of the building or its internal equipment
(plasterboard ceiling, electrical equipment, wooden interior elements, etc.).
Floor drying must always be coordinated with other suppliers.
��
Содержание 11 TG TX
Страница 6: ...Table of technical parameters Figure Table of technical parameters 6...
Страница 19: ...Figure Connection to the heating system and hot water tank...
Страница 20: ...Figure Connection to the heating system and heat exchanger for the pool circuit...
Страница 21: ...Figure Connection to the heating system and storage tank for secondary water supply...
Страница 22: ...Figure Wiring diagram of NeoR heat pump technology...
Страница 24: ...8 Unauthorized connections to the heating system Figure Unauthorized connections to the heating system...
Страница 48: ...8 Hydraulic wiring diagram of the indoor unit Figure 8 Hydraulic diagram of the indoor unit 8...