4. Installation Instruction
4.1 Power Supply Connection
IN12C power connection is single phase 220V, please connect it against local users
actual situation. Connection as below picture: Open the cover on bottom right corner,
L stands for the live wire, N stands for the zero wire, and E stands for the ground wire,
connect to the 220V power supply. According to the wiring requirements, the L
should be connected to one live wire, and the N should be connected to one zero wire;
the E should be connected to one ground wire properly.
4.2 Installation Attentions
♦ Voltage requirement 220V
;
♦ The electricity wire need no less than 2.5mm2, it’s better to directly use 4mm2 (If
2.5mm2, then it can only connect with one set of IN12C Reflow oven, other
equipment will not be allowed to connect together.
♦ The machine should be set in standard SMT workshop, stay away from flammable
and explosive if couldn’t meet previous requirements.
♦ Exposed wire harness should be well protected, prohibit to expose at the passage or
flue in case of causing any accident.