background image

STEP 1:

Inspect shipping package  and contents to 

ensure no damage has occurred during 

shipping.

STEP 2:

Assemble Yoke mount with carriage bolts on 

inside and with washers and nuts.

Note:

By alternating the rotation mounting hole you 

can determine either an upward swing or 

downward swing.

STEP 3:

Install  Yoke Mount with included M6 bolts 

and washers to MR Head.

 

Torque to 7 N-m (62 in-lbs)

STEP 4: 

Mount fixture assembly to desired location 

2-

4x 1/4-20 OR M6 Screws or Bolts.

STEP 5: 

Adjust and Aim fixture to desired position. Torque 

hardware nuts to 9 N-m (80 in-lbs).

STEP 6:

Resume installation instructions provided 

with fixture. (STEP 4)

 

 

  43mm  

4 x   7mm

 72mm

2.83in

51mm

60 deg

MR-YM – YOKE MOUNT INSTALLATION (Ordered Separately)

Refer to alternate instructions if using Pole, Wall, Conduit or Hook Mount

This MR-YM kit is intended for use with UL Listed MR luminaire as 

marked on the luminaire nameplate.  

Accessory Package Contents

INSTALLATION STEPS

MR-YM

PART NAME

QTY

1

1

4

4

4

YOKE MOUNT A

YOKE MOUNT B

1/4-20 HEX NUT

1/4" FLAT WASHER

1/4-20 x 0.5in CARRIAGE BOLT

90° Upward 

        swing

90° Downward 

        swing

TM

Nemalux

I N D U S T R I A L

MR-GEN

rev. A-15

1-1

www.nemalux.com  |   [email protected]  |   Tel 403•242•7475  |   Fax 403•243•6190 

MADE IN CANADA

Содержание MR-GEN

Страница 1: ...age AC 120 277 VAC HV 347 347 VAC 50 60Hz Rated Current MR3 0 25A 120 VAC 0 10A 347 VAC MR6 0 50A 120 VAC 0 20A 347 VAC Connections 3 4 NPT Conduit Black Line White Neutral Green Ground All field wiri...

Страница 2: ...CONFIGURATION SUSPENSION MOUNTING CONFIGURATION TM Nemalux I N D U S T R I A L MR GEN rev A 15 2 4 www nemalux com sales nemalux com Tel 403 242 7475 Fax 403 243 6190 MADE IN CANADA INSTALLATION INST...

Страница 3: ...ug two provided OR Install Direct Rigid Conduit as per local electrical code For direct rigid conduit installation torque hand tight plus 2 to 3 turns NOTE To aid in assembly and protection against in...

Страница 4: ...g connectors provided Connect output wiring using the same wiring connectors Feed output wiring through the remaining NPT hub as described in Step 5 above For dimming connect 18AWG or larger conductor...

Страница 5: ...tallation instructions provided with fixture STEP 4 Set Screw TM Nemalux I N D U S T R I A L MR GEN rev A 15 1 1 www nemalux com sales nemalux com Tel 403 242 7475 Fax 403 243 6190 MADE IN CANADA MR P...

Страница 6: ...7 N m 62 in lbs STEP 5 Install Back Cover Plate with 4x M4 Flat head screws and adhesive backed gasket Apply gasket with adhesive side applied to mount main body Torque to 2 N m 17 in lbs MR WM WALL M...

Страница 7: ...al electrical codes for the specific hazardous locations Torque cable gland base and dome nut to manufacturer s recommended specification OR Install Direct Rigid Conduit as per local electrical code F...

Страница 8: ...position Torque hardware nuts to 9 N m 80 in lbs STEP 6 Resume installation instructions provided with fixture STEP 4 43mm 4 x 7mm 72mm 2 83in 51mm 60 deg MR YM YOKE MOUNT INSTALLATION Ordered Separat...

Страница 9: ...ng in MR high vibration yoke mount and install MR luminaire into yoke The raised circular bosses on the MR cheek plates should register inside of the large circular holes on the MR high vibration yoke...

Страница 10: ...ead lubricant sealant is necessary Un used conduit opening must be plugged to maintain the integrity of the enclosure STEP 3 Install Secondary Safety Cable by looping appropriate steel cable or chain...

Страница 11: ...TEP 3 Slide anti rotation lock onto suspension hook assembly and install hook assembly into NPT threaded entry Tighten to hand tight plus 1 to 2 turns Slide anti rotation lock into place and tighten s...

Страница 12: ...in to fixed eye bolt not supplied using the second stainless steel oval shaped thread ed connecting link Alternate attachment method Wrap loose end of chain around fixed beam or other immovable suppor...

Отзывы: