Nemalux AR Series Скачать руководство пользователя страница 5

5-16

www.nemalux.com  |   [email protected]  |   Tel 403•242•7475  |   Fax 403•243•6190 

MADE IN CANADA

TM

Nemalux

I N D U S T R I A L

AR Series

rev. A-30

AR-PM – POLE MOUNT INSTALLATION1 (Ordered Separately)

Refer to alternate instructions if using Conduit, Hook, Wall, Yoke Mount, or High Vibration Yoke

INSTALLATION STEPS

Step 3

Step 5

STEP 1.

Inspect shipping package  and contents to ensure no 

damage has occurred during shipping.  Discard 

surface/ceiling mounting bracket provided with AR 

luminaire.  Remove 4 x M6 bolts from supply side of luminaire 

and disard.

STEP 2.

Install the provided plastic 3/4” bushing into side 3/4" NPT 

entry. 

STEP 3.

Install  Pole Mount  and gasket with adhesive side applied to 

mount using included M6 bolts and washers.

Torque to 5 Nm (45 in-lbs)

STEP 4.

Thread luminaire assembly onto 1-1/2” NPT pole.

NOTE:

To aid in assembly and protection against ingress use of a 

petrolatum or soap thickened mineral oil based thread 

lubricant/sealant is necessary.

Un-used conduit opening must be plugged to maintain the 

integrity of the enclosure.

STEP 5.

Insert and tension M6 set screw to pole to lock rotation.

STEP 6.

Resume installation instructions provided with luminaire. 

(STEP 4 in AR Installation Instructions provided with 

Luminaire)

SET SCREW

This AR-PM kit is intended for use with UL Listed AR luminaire as 

marked on the luminaire nameplate.  

Accessory Package Contents

AR-PM

PART NAME

QTY

1

1

4

4

1

1

POLE MOUNT

POLE MOUNT GASKET

M6 X 25mm HEX HEAD CAP SCREW

M6 FLAT WASHER

M6 X 16mm HEX HEAD CAP SCREW

3/4 NPT THREADED SMOOTH BORE BUSHING

1-1/2" NPT Entry

WARNING:  

The AR Head must not face 

upwards by any degree 

beyond the vertical position 

for Class II, Division 2, 

Zone 22, and Class III 

hazardous locations. 

LIGHT BEAM

HORIZON

ATTENTION:  

Le luminaire (AR) ne doit pas 

être orientée vers le haut de 

quelque degré que ce soit 

au-delà de la position verticale 

pour les emplacements 

dangereux de Classe II, 

Division 2, Zone 22 et Classe III 

Содержание AR Series

Страница 1: ...proved Locations Class I Division 2 Groups ABCD T4 Class II Division 2 Groups FG T4A Class III Class I Zone 2 Group IIC Zone 22 Certifications NSF models ARXX XXX XX XX FS XX NSF ANSI 2 Splash and Non...

Страница 2: ...0 50 60 50 60 50 60 50 60 50 60 50 60 50 60 50 60 50 60 50 60 LUMINANCE AR10 AR15 AR20 AR25 AR30 AMBIENT TEMP C INPUT VOLTAGE AC HV AC HV Optical AC Flood HV Flood 40 to 55 40 to 50 40 to 45 40 to 40...

Страница 3: ...hors to the 12 7mm 0 5 holes Suspension hardware Not provided must be rated for a minimum of 180 lbs STEP 4 Open AR Lens with a 7mm socket or wrench and allow Lens to hang via retention strap Note Scr...

Страница 4: ...ontrol needs 0 10V Controller must sink current from LED driver 0 10V control connections Dimming controls must be certified and suitable for the classification of the area of their installation NOTE...

Страница 5: ...a petrolatum or soap thickened mineral oil based thread lubricant sealant is necessary Un used conduit opening must be plugged to maintain the integrity of the enclosure STEP 5 Insert and tension M6...

Страница 6: ...M6 bolts and washers and adhesive backed gasket Apply gasket to mount with adhesive backed side Torque to 5 Nm 45 in lbs STEP 5 Install Back Cover Plate with 4x M4 Flat head screws and adhesive backe...

Страница 7: ...sed thread lubricant sealant is necessary Un used conduit opening must be plugged to maintain the integrity of the enclosure STEP 3 Loosely assemble Yoke mount with carriage bolts on inside and washer...

Страница 8: ...all hook assembly into NPT threaded entry Tighten to hand tight plus 1 to 2 turns Slide anti rotation lock into place and tighten set screw to lock unit in place NOTE To aid in assembly and protection...

Страница 9: ...stem must be rated for 180 lbs NOTE To aid in assembly and protection against ingress use of a petrolatum or soap thickened mineral oil based thread lubricant sealant is necessary Un used conduit open...

Страница 10: ...embly and protection against ingress use of a petrolatum or soap thickened mineral oil based thread lubricant sealant is necessary Un used conduit opening must be plugged to maintain the integrity of...

Страница 11: ...stall and prevent loss of fasteners STEP 3 Install provided double sided tape along side of surge protector Remove backing paper and place between mounting points as shown with tape side down Install...

Страница 12: ...ector to splice or terminal connected to Black leads from LED Drivers 3 Connect White lead from surge protector to splice or terminal connected to Neutral Input branch circuit conductor and White lead...

Страница 13: ...nd ensure surge protector is held tightly in place STEP 4 Wire according to wiring instructions on Page 2 Refer to NEC CEC codes and follow all applicable local standards STEP 5 Close AR lens Ensure t...

Страница 14: ...LED Drivers 3 Disconnect Neutral Input branch circuit conductor from splice or terminal connected to White leads from LED Driver Re connect Neutral Input branch circuit conductorto Yellow wire from su...

Страница 15: ...G ATTENTION INSTALLATION STEPS AR SFY SLIP FITTER YOKE MOUNT Ordered Separately This AR SFY kit is intended for use with UL Listed AR luminaire as marked on the luminaire nameplate Accessory Package C...

Страница 16: ...hain to fixed eye bolt not supplied using the second stainless steel oval shaped threaded connecting link Alternate attachment method Wrap loose end of chain around fixed beam or other immovable suppo...

Отзывы: