7-18
Issue 2 December 1995
NEAX 2400 Switch Administration
5. Look at the value in the DATA field and write the value on the following line
NOTE:
Do not change the value in the DATA field until you consult with
your switch administrator. This index contains other fields that
control features not related to MCI.
6. Enter 01 in the DATA field.
You have completed the NEAX 2400 MCI switch administration. Proceed to
Chapter 8, "Switch Integration Device Administration", to configure the switch
integration device.
Current DATA value: _________
Содержание NEAX 2400
Страница 2: ...Blank Page ...
Страница 8: ...Contents viii Issue 2 December 1995 ...
Страница 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics ...
Страница 42: ...3 6 Issue 2 December 1995 Switch Integration Planning ...
Страница 52: ...4 10 Issue 2 December 1995 Hardware Installation ...
Страница 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration ...
Страница 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration ...
Страница 122: ...A 10 Issue 2 December 1995 ...
Страница 128: ...B 6 Issue 2 December 1995 ...
Страница 140: ...Abbreviations ABB 6 Issue 2 December 1995 ...