Issue 2 December 1995
7-17
Configuring the Message Center Interface Link
Use the following instructions to configure the UCD group with the MCI link.
1. At the INSTALLATION COMMANDS menu, shown in Figure 7-6., enter 1 to
select the System Data option. After you press ,
you see the
ASSIGNMENT OF STATION DATA screen as shown in Figure 7-10.
Figure 7-10. Assignment of System Data
2. Enter 2 in the SYS field to tell the switch to associate the MCI link with a
UCD group on a tenant by tenant basis.
3. Enter 1 in the TN field. You must use the same tenant value that you used
to create the analog stations and UCD groups.
4. Enter 6 in the INDEX field. The value contains fields that allow the system
to associate the MCI link with the UCD group or groups.
ENTER
Assignment of System Data
SYS: 2 TN: 1 SYS : System Data Items
INDEX: 6 DATA: 01 1-System Data 1
2-System Data 2
3-System Data 3
TN : Tenant Number
INDEX: System Data Index
System Index
1 0-255
2 0-15
3 0-31
DATA : System Data (Hexa-decimal)
Содержание NEAX 2400
Страница 2: ...Blank Page ...
Страница 8: ...Contents viii Issue 2 December 1995 ...
Страница 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics ...
Страница 42: ...3 6 Issue 2 December 1995 Switch Integration Planning ...
Страница 52: ...4 10 Issue 2 December 1995 Hardware Installation ...
Страница 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration ...
Страница 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration ...
Страница 122: ...A 10 Issue 2 December 1995 ...
Страница 128: ...B 6 Issue 2 December 1995 ...
Страница 140: ...Abbreviations ABB 6 Issue 2 December 1995 ...