Issue 2 December 1995
9-1
9
Acceptance Tests
Do not perform any tasks in this chapter until you complete the required tasks in
the following appropriate documents:
■
Intuity MAP/5 Hardware Installation,
585-310-137
■
Intuity MAP/40 Hardware Installation,
585-310-138
■
Intuity MAP/100 Hardware Installation,
585-310-139
■
Intuity Software Installation,
585-310-140
The installation documents explain when you must use the instructions in this
chapter. If you have not performed the tasks in the installation documents,
complete the tasks now. This chapter explains how to administer the switch to
perform acceptance tests for the Intuity system.
Содержание NEAX 2400
Страница 2: ...Blank Page ...
Страница 8: ...Contents viii Issue 2 December 1995 ...
Страница 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics ...
Страница 42: ...3 6 Issue 2 December 1995 Switch Integration Planning ...
Страница 52: ...4 10 Issue 2 December 1995 Hardware Installation ...
Страница 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration ...
Страница 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration ...
Страница 122: ...A 10 Issue 2 December 1995 ...
Страница 128: ...B 6 Issue 2 December 1995 ...
Страница 140: ...Abbreviations ABB 6 Issue 2 December 1995 ...