Issue 2 December 1995
5-7
Load the SID Software
12. Press
(F3).
After you press the key, you receive a confirmation message as shown in
Figure 5-3. The message tells you that the serial port was registered
successfully and that you need to start the voice system
Figure 5-3
Switch Link Administration Confirmation Message
13. Press
(F6).
You
see the Switch Link Administration screen.
14. Press
(F6)
again.
You
see several
messages indicating that the installation is still running.
When the installation process finishes, you see the following messages:
Installation of INTUITY SID Integration Package (sid)
was successful.
Insert a diskette into Floppy Drive 1.
Type [go] when ready
or [q] to quit: (default: go)
15. Remove Disk 2 of 2 from the floppy drive.
16. Enter q to quit.
The Software Install screen is redisplayed.
17. Press
until you see the INTUITY Administration menu.
Restart the voice system as described in the next section.
SAVE
CANCEL
CANCEL
CANCEL
Содержание NEAX 2400
Страница 2: ...Blank Page ...
Страница 8: ...Contents viii Issue 2 December 1995 ...
Страница 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics ...
Страница 42: ...3 6 Issue 2 December 1995 Switch Integration Planning ...
Страница 52: ...4 10 Issue 2 December 1995 Hardware Installation ...
Страница 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration ...
Страница 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration ...
Страница 122: ...A 10 Issue 2 December 1995 ...
Страница 128: ...B 6 Issue 2 December 1995 ...
Страница 140: ...Abbreviations ABB 6 Issue 2 December 1995 ...