22
⑤
When the following prompt is displayed, the SDR/PIA setup is completed.
Example)
⑥
With reference to N codes of the server, be sure to confirm SDR Rev as follows.
SDR Revision differs depending on the mounted CPU and optional product.
Target server
N8100-1668F/1669F/1670F/1671F/1672F
Power Supply type
Redundant power unit
Fixed power unit
HDD type
3.5-inch
2.5-inch
3.5-inch
2.5-inch
SDR Revision
00.xxc *
00.xxg
00.xxd
00.xxh
Product ID
055D
Target server
N8100-1665F/1666F/1667F
CPU Clock
2.4GHz(N8100-1665F)
2.66GHz(N8100-1666F)
2.93GHz(N8100-1667F)
SDR Revision
00.xxC *
00.xxA
Product ID
055A
*
case sensitivity
If “SDR Revision" is not match above list, please check again the jumper setting and cable
connecting.
Clear the event log
① Remove CD-ROM from the optical disk drive, and turn off/on power to reboot the server.
②
< F2 > key is pushed in POST, and BIOS SETUP is started.
③ Clear the event log by following procedure.
[Server] → [Event Log Configuration] → [Clear All Event Logs] → [Enter] → [YES]
Device ID : 38
Device Revision : 01
BMC Firmware Revision : 01.17
IPMI Version : 2.0
Product ID : 055A
Boot Firmware Revision : 00.17
PIA Revision : 01.06
SDR Revision : 00.03C
CFG Identify : A2MBHR
Self Test Results : 5500
All programming complete!!
Remove CD-R, reset the server for normal operation.
C:>
Содержание N8154-24
Страница 17: ...5 9 本体装置の底面にあるネジ 2 本を外します 10 ディスクケージフレーム側面からネジを 2 本外します 11 ディスクケージフレームをL字型の溝に沿って 持ち上げて移動させます ...
Страница 19: ...7 15 手順 7 で外した皿ネジ 2 本で本体シャーシ前面を固定します 16 本体装置の前面の下側スロットに 2 5 型ディスクケージを取り付け 本製品に添付されているネジ 4 本で固定します ...
Страница 21: ...9 21 ケーブルを温度センサーボードに接続します 22 ケーブルを傷つけないように注意しながら温度センサーボードを取り付けたブラケットを取り付け ます 23 本製品に添付のネジ 3 本で固定します ...
Страница 34: ...22 ...
Страница 58: ...13 Make sure that the jumper settings are as shown below ...