5-23
Upgrades and Options
Installing an Option Board
Note: Before installing an ISA non-plug and play option
board run the RCU and configure the resources required
by the option board.
1. Power off the system and remove the left side panel
(as viewed from front) as described earlier in this
chapter.
2. Observe the safety and ESD precautions at the
beginning of this chapter.
3. Remove and save the expansion slot screw and cover
(Figure 5-9).
Figure 5-9. Removing the Expansion Slot Screw and Cover
A
B
A
Expansion slot cover
B
Expansion slot screw
Notice: Observe static precautions. Use an antistatic
wrist strap.
Содержание MT2200
Страница 1: ... Server MT2200 U s e r s G u i d e ...
Страница 2: ...xxx ...
Страница 3: ... Server MT2200 U s e r s G u i d e ...
Страница 6: ... xxx ...
Страница 8: ...Bill Graham ...
Страница 10: ...Bill Graham ...
Страница 11: ...Chapter 1 Introduction Contents Organization 1 Notational Conventions 3 ...
Страница 12: ...Bill Graham ...
Страница 18: ...xxx ...
Страница 46: ...xxx ...
Страница 54: ...1231231 Billy Graham ...
Страница 88: ...4 34 Configuring Your System ...
Страница 90: ...xxxxx ...
Страница 107: ...5 17 Upgrades and Options Figure 5 7 Inserting Memory DIMMs A B C J20 J19 J18 J17 ...
Страница 134: ...5 44 Upgrades and Options Figure 5 22 Removing the Front Fan modules ...
Страница 136: ...5 46 Upgrades and Options ...
Страница 138: ...dfgdfg ...
Страница 166: ...Bill GrahamBill Graham ...
Страница 175: ...Appendix B Memory Configurations Contents Memory DIMM Configurations 1 ...
Страница 176: ...Bill Grahamaerrterterter ...
Страница 180: ...rtyrtyrtyrtyry ...
Страница 190: ...8 Glossary ...
Страница 191: ...xx ...
Страница 192: ... 101907 01 ...