3-8 Setting Up Your Server
Installation Procedure for NEC Rack/Third Vendor's Rack
This server can be installed in either the NEC rack or a third vendor's rack. Take the following
procedure to install the server in the rack:
IMPORTANT:
When installing the optional cable arm, see the
instruction manual provided with the cable arm.
Removing the Rail Assemblies
Remove the sliding rails from the server.
Hold the rails and slowly slides them toward the rear of the server until a "click" is heard. The
click indicates that the rails are locked.
Push the release levers on the right and left sides of the server, and remove the rail assemblies from
the server while unlocking.
Only the inner rails remain screwed to the server when the rail assemblies have been removed.
Release lever
Inner rails
Содержание Express5800/120Rg-2
Страница 1: ...N8100 952F 953F 954F NEC Express5800 120Rg 2 User s Guide 1st Edition 8 2004 856 124045 102 00 ...
Страница 10: ...iv This page is intentionally left blank ...
Страница 32: ...1 16 Notes on Using Your Server This page is intentionally left blank ...
Страница 192: ...6 24 Installing and Using Utilities This page is intentionally left blank ...
Страница 204: ...7 12 Maintenance This page is intentionally left blank ...
Страница 298: ...9 58 Upgrading Your Server This page is intentionally left blank ...
Страница 300: ...A 2 Specifications This page is intentionally left blank ...
Страница 308: ...C 2 IRQ This page is intentionally left blank ...
Страница 338: ...F 4 Product Configuration Record Table This page is intentionally left blank ...