
3-12 Setting Up Your Server
2.
At least two persons are required to install the server. Securely hold the server and
install it in the rack.
Firmly fit the inner rails on the sides of the server into the rail assemblies that are installed
on the rack, and then slowly push the server into the rack.
If the server is locked on its way into the rack, slowly push it in while pressing the release
levers on the right and left sides of the server.
When the server is installed for the first time, the mechanical parts are rather hard to slide.
You may feel strong friction when pushing in the server. In this case, strongly push it in.
3.
Confirm that the sliding rails work normally by pulling the server out of the rack and
pushing it in several times.
NOTE:
Confirm that the sliding rails work normally. If the sliding
rails are stuck to the rack frame and do not come out, reinstall them.
Release lever
Содержание Express5800/120Rg-2
Страница 1: ...N8100 952F 953F 954F NEC Express5800 120Rg 2 User s Guide 1st Edition 8 2004 856 124045 102 00 ...
Страница 10: ...iv This page is intentionally left blank ...
Страница 32: ...1 16 Notes on Using Your Server This page is intentionally left blank ...
Страница 192: ...6 24 Installing and Using Utilities This page is intentionally left blank ...
Страница 204: ...7 12 Maintenance This page is intentionally left blank ...
Страница 298: ...9 58 Upgrading Your Server This page is intentionally left blank ...
Страница 300: ...A 2 Specifications This page is intentionally left blank ...
Страница 308: ...C 2 IRQ This page is intentionally left blank ...
Страница 338: ...F 4 Product Configuration Record Table This page is intentionally left blank ...