
9-8 Upgrading Your Server
6.
Align the drive carrier with the bay guide rail.
7.
Slide the drive carrier into the bay until it locks with the SCSI backplane connector.
IMPORTANT:
Push the hard disk drive carrier until the hook of the handle hits the
frame.
Hold the hard disk drive carrier with both hands securely and
carefully.
8.
Close the lever ensuring the drive is secured.
The handle is locked when a distinct "click" is heard.
IMPORTANT:
Be careful not to get your finger caught between the
handle and tray.
NOTE:
Confirm that the handle is hooked to the frame when having
inserted the hard disk drive.
9.
Install the front bezel you removed in step 2.
There are tabs on the left side of the front bezel. Engage the tabs with the server frame,
install the front bezel, and lock it with the security key.
Hook
Содержание Express5800/120Rg-2
Страница 1: ...N8100 952F 953F 954F NEC Express5800 120Rg 2 User s Guide 1st Edition 8 2004 856 124045 102 00 ...
Страница 10: ...iv This page is intentionally left blank ...
Страница 32: ...1 16 Notes on Using Your Server This page is intentionally left blank ...
Страница 192: ...6 24 Installing and Using Utilities This page is intentionally left blank ...
Страница 204: ...7 12 Maintenance This page is intentionally left blank ...
Страница 298: ...9 58 Upgrading Your Server This page is intentionally left blank ...
Страница 300: ...A 2 Specifications This page is intentionally left blank ...
Страница 308: ...C 2 IRQ This page is intentionally left blank ...
Страница 338: ...F 4 Product Configuration Record Table This page is intentionally left blank ...