![background image](http://html.mh-extra.com/html/nec/express5800-120rg-2/express5800-120rg-2_user-manual_251210297.webp)
Upgrading Your Server 9-57
Removal
1.
See section "Preparing for Installation and Removal" described earlier to prepare.
IMPORTANT:
The remote management card logic monitors and logs
system voltage changes. When removing the RMC from the
motherboard, you may experience a 3 - 4 second delay from the time
your system powering down.
2.
Pull out the server from the rack.
3.
Open the logic cover.
4.
Open the levers on the both sides of the RMC connector to unlatch the RMC.
5.
Remove the RMC from the connector.
6.
Run BIOS SETUP utility and check to see that menus related to the RMC are not
displayed in the Server menu.
See Chapter 4 for details.
7.
Run BIOS SETUP utility and select "Yes" for [Reset Configuration Data] in the
[Advanced] menu.
This setting is required to change the hardware configuration data. See Chapter 4 for
details.
8.
Uninstall NEC ESMPRO Agent if installed.
9.
(Re)install NEC ESMPRO Agent.
To correct the system information and event log from the management PC, NEC
ESMPRO Agent must be installed in the server.
Содержание Express5800/120Rg-2
Страница 1: ...N8100 952F 953F 954F NEC Express5800 120Rg 2 User s Guide 1st Edition 8 2004 856 124045 102 00 ...
Страница 10: ...iv This page is intentionally left blank ...
Страница 32: ...1 16 Notes on Using Your Server This page is intentionally left blank ...
Страница 192: ...6 24 Installing and Using Utilities This page is intentionally left blank ...
Страница 204: ...7 12 Maintenance This page is intentionally left blank ...
Страница 298: ...9 58 Upgrading Your Server This page is intentionally left blank ...
Страница 300: ...A 2 Specifications This page is intentionally left blank ...
Страница 308: ...C 2 IRQ This page is intentionally left blank ...
Страница 338: ...F 4 Product Configuration Record Table This page is intentionally left blank ...