![background image](http://html.mh-extra.com/html/nec/express5800-120rg-2/express5800-120rg-2_user-manual_251210267.webp)
Upgrading Your Server 9-27
16.
Install the covers you removed previously.
17.
Power on the server, start the SETUP utility, and set "Processor Retest" of "Processor
Settings" on the Main menu to "Enable".
18.
Verify that POST displays no error messages.
If POST displays an error message, take a note on the message and see the POST error
messages listed in Chapter 8.
19.
Set "Reset Configuration Data" on the Advanced menu to "Yes".
This setting is required to change the hardware configuration data. See Chapter 4 for
details.
20.
To add one or more CPUs to the server in 1-CPU configuration to operate the server with
more than one CPU, change the driver of [Computer] in the device manager to [ACPI
multi-processor PC] and then update the system (see Chapter 5).
NOTE:
Step 20 is required when the Hyper-threading technology
feature is disabled in the BIOS SETUP Utility.
Содержание Express5800/120Rg-2
Страница 1: ...N8100 952F 953F 954F NEC Express5800 120Rg 2 User s Guide 1st Edition 8 2004 856 124045 102 00 ...
Страница 10: ...iv This page is intentionally left blank ...
Страница 32: ...1 16 Notes on Using Your Server This page is intentionally left blank ...
Страница 192: ...6 24 Installing and Using Utilities This page is intentionally left blank ...
Страница 204: ...7 12 Maintenance This page is intentionally left blank ...
Страница 298: ...9 58 Upgrading Your Server This page is intentionally left blank ...
Страница 300: ...A 2 Specifications This page is intentionally left blank ...
Страница 308: ...C 2 IRQ This page is intentionally left blank ...
Страница 338: ...F 4 Product Configuration Record Table This page is intentionally left blank ...