![background image](http://html.mh-extra.com/html/nec/express5800-120rf-2/express5800-120rf-2_user-manual_251205107.webp)
Upgrading Your System 4-3
Tools Recommended for Upgrading Your
System
Depending on the upgrade, you will need one or more of the following tools:
!
Phillips screwdriver (#1 bit and #2 bit)
!
Flat-head screwdriver
!
Small needle nose pliers
!
Pen or pencil
!
ESD workstation or antistatic wrist strap (recommended)
Preparing Your System for Upgrade
To prepare your system for installation or removal of system components
perform the following procedure:
1.
Observe the safety and ESD precautions listed under
General Information
and
Static Precautions
at the beginning of this chapter.
2.
Shutdown the operating system (OS).
3.
Unlock and remove the front bezel.
4.
Press the power on/off switch on the front panel of the server (see
Front View
in Chapter 2). The power-on LED goes out.
5.
Power off the peripheral devices.
6.
Unplug the system power cord(s) from the AC wall outlet(s).
Note:
If the system power cord is connected to a power
control unit such as an UPS (Uninterruptible Power Supply),
refer to the UPS user's guide for proper power-off
procedures.
7.
Unplug all the I/O cables connected to the rear panel of your system.
Содержание Express5800/120Rf-2
Страница 1: ... U s e r s G u i d e EXPRESS5800 120Rf 2 ...
Страница 2: ......
Страница 4: ......
Страница 10: ...viii Contents ...
Страница 61: ...Setting Up the System 2 29 Figure 2 34 Making Connections ...
Страница 80: ......
Страница 186: ...5 22 Problem Solving ...
Страница 187: ...A Specifications System Specifications ...
Страница 197: ...C Interrupt Requests ...
Страница 199: ...Interrupt Requests C 3 ...
Страница 209: ...10 Glossary ...
Страница 214: ...xx ...
Страница 215: ... 456 01669 000 ...