![NEC Express5800/120Rf-2 Скачать руководство пользователя страница 133](http://html.mh-extra.com/html/nec/express5800-120rf-2/express5800-120rf-2_user-manual_251205133.webp)
Upgrading Your System 4-29
10.
Close and lock the retainer clip. See Figure 4-29.
A
B
C
D
C
D
A
Low-profile riser card
B
Full-height riser card
C
Retainer Clip
D
Locking Tab
Figure 4-29. Closing and Locking the Retainer Clip
11.
Align the riser card with the slot on the system board, and firmly push the
riser card until it is fully seated. See Figure 4-30.
A
B
A
Low-profile riser card
B
Full-height riser card
Figure 4-30. Installing the Riser Cards
Содержание Express5800/120Rf-2
Страница 1: ... U s e r s G u i d e EXPRESS5800 120Rf 2 ...
Страница 2: ......
Страница 4: ......
Страница 10: ...viii Contents ...
Страница 61: ...Setting Up the System 2 29 Figure 2 34 Making Connections ...
Страница 80: ......
Страница 186: ...5 22 Problem Solving ...
Страница 187: ...A Specifications System Specifications ...
Страница 197: ...C Interrupt Requests ...
Страница 199: ...Interrupt Requests C 3 ...
Страница 209: ...10 Glossary ...
Страница 214: ...xx ...
Страница 215: ... 456 01669 000 ...