![background image](http://html.mh-extra.com/html/nec/express5800-120rf-2/express5800-120rf-2_user-manual_251205111.webp)
Upgrading Your System 4-7
Installation
1.
Position the top cover over the server. When installing the top cover,
confirm that the tab of the cover is securely inserted into the slot in the
server frame.
Figure 4-4. Installing the Top Cover
2.
Slide the top cover toward the front of the server. The top cover is locked
when a "click" is heard. At this time, check the release button for normal
state. When the top cover is securely locked, the release button springs up. If
the release button is held down (hollow state), slide the top cover toward the
front of the server again. If the top cover is not locked yet, remove the cover,
and then install it again.
Figure 4-5. Locking the Top Cover
Содержание Express5800/120Rf-2
Страница 1: ... U s e r s G u i d e EXPRESS5800 120Rf 2 ...
Страница 2: ......
Страница 4: ......
Страница 10: ...viii Contents ...
Страница 61: ...Setting Up the System 2 29 Figure 2 34 Making Connections ...
Страница 80: ......
Страница 186: ...5 22 Problem Solving ...
Страница 187: ...A Specifications System Specifications ...
Страница 197: ...C Interrupt Requests ...
Страница 199: ...Interrupt Requests C 3 ...
Страница 209: ...10 Glossary ...
Страница 214: ...xx ...
Страница 215: ... 456 01669 000 ...