![background image](http://html.mh-extra.com/html/nec/express5800-120md-series/express5800-120md-series_user-manual_251192055.webp)
Setting Up the System 2-13
Attaching the Cable Retention Arm
The dual-hinged cable retention arm attaches to the rear of the server and allows
cables to swing in and out of the way as the server slides back and forth within
the rack cabinet. All the server cables can be tie-wrapped to the cable retention
arm.
Note:
For easy installation of the cable retention arm,
first slide the server into the rack cabinet and then install the
cable retention arm.
1.
Using two screws attach one end of the cable retention arm to the rear of the
server (see Figure 2-9).
2.
Using two screws attach the other end of the cable retention arm to the cage
nuts installed in the left rear vertical mounting rail (see Figure 2-9).
3.
Bundle all the server cables together and tie-wrap them to the cable retention
arm.
Figure 2-9. Attaching the Cable Retention Arm
Содержание EXPRESS5800/120Md Series
Страница 1: ... U s e r s G u i d e EXPRESS5800 120Md ...
Страница 2: ...NEC ...
Страница 3: ... U s e r s G u i d e EXPRESS5800 120Md ...
Страница 58: ...2 16 Setting Up the System Figure 2 10 Connecting the AC Power Cord to the Server ...
Страница 64: ...2 22 Setting Up the System ...
Страница 92: ...3 28 Configuring Your System ...
Страница 165: ...A Technical Specifications Server Unit ...
Страница 168: ...A 4 Technical Specifications ...
Страница 174: ...B 6 Interrupt Request PCI IRQ Device I O Port Address Assignments ...
Страница 185: ...D ROMPilot BIOS Error Codes ROMPilot BIOS Error Codes ...
Страница 188: ...D 4 ROMPilot BIOS Error Codes ...
Страница 198: ...10 Glossary ...
Страница 204: ...Index 4 ...
Страница 205: ...xx ...
Страница 206: ... 456 01557 N00 ...