background image

NEC Express5800 Fault Tolerant Virtual Server Quick Start Guide

 22 

Table 4 shows the total physical server resources for the Virtual Server host computer. 

Memory Allocation 

Disk Allocation 

CPU Allocation 

8 GB 

1500 GB 

2 x 3 GHz 

Table 4: Host server resource allocation 

Creating the Virtual Machines 

When you create a virtual machine instead of adding an existing virtual machine, you must assign a virtual hard 
disk to it and install an operating system on the virtual hard disk. This process will vary with the requirements of 
each installation. However, there are a number of key stages to ensure a smooth migration to a virtual machine 
environment. The first step is to create the Virtual Machine settings on the Virtual Server. 

To create a new virtual machine: 

1.  On the system that is running the 

management Website

, open the 

Administration Website

2. In 

the 

navigation pane

, under 

Virtual Machines

, click 

Create

3. In 

the 

Virtual machine name

 box, type a name for the virtual machine and specify a 

fully qualified 

path

 to the location where you want to create the 

virtual machine hard disks

Note: For this Guide, we have used a simplified naming standard for clarity; we recommend you use a 
naming standard that is appropriate for your organization. 

4. In 

the 

Virtual machine memory box

, type the 

required memory allocation

 in 

megabytes

Note: If you allocate more memory to virtual machines than is available in the virtual server the virtual 
machines will not start. 

5. In 

the 

Virtual hard disk

 box, select 

Create a new virtual hard disk

6. To 

set 

the 

size

 of the 

virtual hard disk

, specify a value in the 

Size 

box. 

7. Under 

Virtual network adapter

, in 

Connected to

, select the network adapter team. 

8. Click 

Create

Repeat this process for each of the servers that you migrate to the virtual server. Once you have created these 
virtual machine settings you can build each virtual machine. The Guide uses the following virtual machines: 

 

Domain controller (DC1) 

 

File server (FS1) 

 Email 

server 

(EX1) 

The following checklists provide the key stages in the virtual machine creation process. The checklists highlight 
the important information and steps that you must take to complete the creation of each virtual machine. 

Virtual Machine Additions 

Virtual Machine Additions is a set of features that improves the integration of the virtual server and virtual 
machine operating systems. It also improves the performance and manageability of the virtual machine 
operating system. You must install Virtual Machine Additions after you install the operating system on the virtual 
machine and restart Windows on the virtual machine after installation. 

To install Virtual Machine Additions: 

1. On 

the 

Master Status

 page, click the 

arrow to the right of the virtual machine

 and select 

Edit 

Configuration

2.  Select the link to start 

Virtual Machine Additions setup

Содержание Express 5800

Страница 1: ...ver Quick Start Guide Install and Configure NEC Fault Tolerant Servers to Provide Maximum Availability to Virtual Server 2005 R2 SP1 For the latest information please see http www necam com servers ft...

Страница 2: ...work Adapter Teaming 13 STEP 4 Install and Configure Virtual Server 2005 R2 SP1 15 Installing Virtual Server 16 Virtual Server Web Application 16 STEP 5 Installing and Configuring the Guest Virtual Ma...

Страница 3: ...onfiguring Windows Server 2003 Enterprise Edition Configuring the hardware Installing Virtual Server 2005 R2 SP1 Configuring the virtual machines Because the Guide uses a scenario to provide a context...

Страница 4: ...a stand alone server not as part of a Windows cluster You install the Microsoft Virtual Machine PCI SCSI Controller driver on the guest operating system You do not enable the virtual hard disk Undo f...

Страница 5: ...ebsite http support necam com servers ft If you want to learn more about the capabilities of Microsoft Virtual Server R2 SP1 you can read more on the Microsoft website http www microsoft com virtualse...

Страница 6: ...imary or active adapter and all other adapters are secondary or backup adapters If the active adapter fails in a fault tolerant team the backup adapter becomes active and seamlessly continues operatio...

Страница 7: ...ailure with SFT Adaptive Load Balancing Teams In an Adaptive Load Balancing ALB team both the primary and secondary adapters transmit data to provide an increase in performance However only the primar...

Страница 8: ...ck mechanism is unlocked when you insert the power cord 4 Connect one end of cable B to the receptacle on the second module Connect the other end to a second separate power source 5 At the front of th...

Страница 9: ...m associated drivers and utilities on the FT Server Initial program load IPL Post initial program load Post IPL NEC engineers typically complete the IPL procedure before you receive the server which c...

Страница 10: ...on Check Tool dialog box appears and runs automatically This tool verifies that the install was successful Click Exit to dismiss the Post Installation Check Tool dialog box 11 The Has the NEC ExpressC...

Страница 11: ...tual solution To configure Windows to create an optimal environment for Virtual Server 2005 R2 SP1 consider the following 1 Do not use the 3GB in boot ini switch to alter Windows memory allocation For...

Страница 12: ...performance In addition install the standard anti virus protection of your organization into each virtual machine to protect the virtual machine directly After you install Windows and the necessary N...

Страница 13: ...nternal storage enclosure of the FT Server Internal disks are the only disk configuration that supports RDR disk mirroring With RDR disk mirroring you mirror pairs of physical disks to create virtual...

Страница 14: ...ystem disk use the same process but locate the CPU I O enclosure bay that indicates Unconfigured System Disk in Step 3 While the disks are re synchronizing LEDs blink to indicate read and write operat...

Страница 15: ...g complete the following steps 1 Start the PROSet utility and in the notification area double click PROSet 2 In the Intel PROSet for Wired Connections dialog box right click one of the Ethernet ports...

Страница 16: ...Next and click Finish 6 When the Intel PROSet for Wired Connections dialog box reappears click Apply PROSet binds the specified adapters into teams This operation takes at least one minute per team t...

Страница 17: ...can use for the virtual machines You reduce the attack surface for the Virtual Server host system by not installing Internet Information Services IIS You can automatically launch Windows updates on th...

Страница 18: ...defaults in the installation wizard 6 Click Install to begin the installation 7 Once the installation is complete the Setup Complete page appears Click Finish to close the page and exit the Setup Wiza...

Страница 19: ...separate system that is running the management website 1 On the computer on which you intend to install the Administration Website for Virtual Server from the Virtual Server 2005 CD ROM start the Vir...

Страница 20: ...installation is complete the Setup Complete page appears Click Finish to close the page and exit the Setup Wizard After you install Virtual Server R2 SP1 on the FT Server and the management Website o...

Страница 21: ...physical servers to virtual machines by using a physical to virtual P2V process You can build the virtual machines directly on the production virtual server by using standard installation media You mu...

Страница 22: ...achine and install all software manually Enables straightforward creation of virtual machines Time consuming build process Remote replication of data Identification of software configuration requireme...

Страница 23: ...te minimum levels A server with 40 percent memory utilization in a 1 GB system requires at least 400 MB of RAM A server with 70 percent CPU utilization in a 1 GHz system requires at least 0 7 GHz of p...

Страница 24: ...tion in megabytes Note If you allocate more memory to virtual machines than is available in the virtual server the virtual machines will not start 5 In the Virtual hard disk box select Create a new vi...

Страница 25: ...test service pack and updates to the DC1 virtual machine Add the Domain Controller Active Directory server role to DC1 For guidance on this process see the Domain controller role Configuring a domain...

Страница 26: ...chever solution you use there are a few important steps that you should follow to complete the migration process BEFORE you take the physical server offline Allocate sufficient time to complete a full...

Страница 27: ...tioning correctly you can start the process of decommissioning the physical email server Decommissioning the physical email server Remove the physical email server from the Exchange organization Use t...

Страница 28: ...hines to save the current state when the virtual server stops and to automatically start when the virtual server starts To configure the Save state and Automatic restart options 1 On the Master Status...

Страница 29: ...each virtual machine individually to ensure that the baseline creation process does not introduce a significant load onto the host server Get more information or download the free Server Performance A...

Страница 30: ...a list of useful resources to help you to configure your server The NECAM Online Server Support Guide The first place to look for help is the NECAM website at http support necam com servers ft The Mi...

Страница 31: ...ed after the date of publication This Quick Start Guide white paper is for informational purposes only MICROSOFT MAKES NO WARRANTIES EXPRESS OR IMPLIED IN THIS DOCUMENT Complying with all applicable c...

Отзывы: