![background image](http://html.mh-extra.com/html/nec/express-5800-120lg/express-5800-120lg_service-manual_251153105.webp)
Disassembly and Reassembly 4-39
Installation
1.
Prepare your system for upgrade. See
Preparing Your System for
Disassembly and Reassembly
described earlier in this chapter.
2.
Remove the side cover.
3.
Remove the two screws fixing the dummy cover. See Figure 4-39.
4.
Pull out the dummy cover toward you carefully.
NOTE:
When installing a full-height device, remove two dummy covers.
Figure 4-39. Removing Dummy Covers
5.
Attach the rails to the 5.25-inch device by using the four screws. See Figure
4-40.
Figure 4-40. Attaching the Rails
IMPORTANT:
When installing a double-height device, use the DLT
device rails that is included with the server.
Содержание Express 5800/120Lg
Страница 1: ... S e r v i c e G u i d e EXPRESS5800 120Lg ...
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 73: ...Disassembly and Reassembly 4 7 Figure 4 2 Installing the Left Hand Side Access Panel ...
Страница 132: ......
Страница 161: ...6 Illustrated Parts Breakdown Exploded View Field Replaceable Units ...
Страница 168: ......
Страница 169: ...A Specifications System Specifications ...
Страница 179: ...C IRQ and I O Port Addresses Interrupt Requests PIRQ and PCI Device ...
Страница 188: ......
Страница 198: ......
Страница 203: ...xx ...
Страница 204: ... 456 01673 000 ...