![background image](http://html.mh-extra.com/html/nec/express-5800-120lg/express-5800-120lg_service-manual_251153121.webp)
Disassembly and Reassembly 4-55
A
B
C
A
Hot-swap HDD bay
B
Hot-swap SCSI backplane
C
Screws (8)
Figure 4-52. Removing the SCSI Backplane Bracket
4.
Carefully pull the SCSI backplane straight out from the HDD bay and place
the backplane on an antistatic wrapper.
5.
Carefully position the replacement SCSI backplane on to the rear of the
HDD bay and secure it with the eight screws removed in Step 3. See Figure
4-52.
6.
At the front of the server, install the HDD bay into the chassis and secure it
with eight screws. See Figure 4-51.
7.
Connect the power cables, HSBP (I
2
C) cable, and SCSI interface cable to
their connectors on the SCSI backplane.
8.
Install the optional front cooling fan unit following procedures previously
described in this chapter, if previously removed.
9.
Install the left-hand side access panel as described earlier in this chapter.
10.
Install all the drive carriers into the HDD bay.
Содержание Express 5800/120Lg
Страница 1: ... S e r v i c e G u i d e EXPRESS5800 120Lg ...
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 73: ...Disassembly and Reassembly 4 7 Figure 4 2 Installing the Left Hand Side Access Panel ...
Страница 132: ......
Страница 161: ...6 Illustrated Parts Breakdown Exploded View Field Replaceable Units ...
Страница 168: ......
Страница 169: ...A Specifications System Specifications ...
Страница 179: ...C IRQ and I O Port Addresses Interrupt Requests PIRQ and PCI Device ...
Страница 188: ......
Страница 198: ......
Страница 203: ...xx ...
Страница 204: ... 456 01673 000 ...