![background image](http://html.mh-extra.com/html/nec/express-5800-120lg/express-5800-120lg_service-manual_251153130.webp)
4-64
Disassembly and Reassembly
10.
Snap the replacement I/O shield into place in the rear panel.
11.
Install the system board following procedures previously described in this
chapter.
12.
Install the left-hand side access panel.
LED/Switch Assembly
Your server system contains a front panel that houses the LED/switch assembly.
You must open the front bezel to access the front panel. To remove the front
panel LED/switch assembly, perform the following procedures:
1.
Prepare your system for disassembly. See
Preparing Your System for
Disassembly and Reassembly
earlier in this chapter.
2.
Remove the left-hand side access panel of the system chassis following
procedures previously described in this chapter.
3.
Remove the front panel following procedures previously described in this
chapter. See
Front Panel
earlier in this chapter.
4.
Remove the power switch, reset switch and dump switch from the front of
the chassis. To release these switches, squeeze their two plastic snap tabs
together and slide the switch back until it is free of the chassis.
See Figure 4-59, A.
A
B
C
A
Switches (3)
B
Cable
C
System Board Connector
Figure 4-59. Replacing the LED/Switch Assembly
Содержание Express 5800/120Lg
Страница 1: ... S e r v i c e G u i d e EXPRESS5800 120Lg ...
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 73: ...Disassembly and Reassembly 4 7 Figure 4 2 Installing the Left Hand Side Access Panel ...
Страница 132: ......
Страница 161: ...6 Illustrated Parts Breakdown Exploded View Field Replaceable Units ...
Страница 168: ......
Страница 169: ...A Specifications System Specifications ...
Страница 179: ...C IRQ and I O Port Addresses Interrupt Requests PIRQ and PCI Device ...
Страница 188: ......
Страница 198: ......
Страница 203: ...xx ...
Страница 204: ... 456 01673 000 ...