Index
4
Index
Aspila EX Hardware
Programming
Entering
. . .
2-51
Programming for System and Alarm Reports
. . .
5-3
Programming SMDR
. . .
5-5
Programming, Initial
. . .
2-51
Q
Quitting Test Mode
. . .
3-11
R
Reinstalling the Front Cover
. . .
1-34
Relays, External Paging and Page
. . .
4-15
Removing an Extension or Trunk PCB
. . .
2-4
Removing the Adapter Cover
. . .
4-22
Removing the Faceplate
. . .
4-17
Removing the Front Cover
. . .
1-4
Removing the Side Panels
. . .
1-5
Replacing Power Supplies in the Main and Expan-
sion Cabinets
. . .
1-31
Replacing the Faceplate
. . .
4-17
Requirements
Environmental
. . .
7-3
Power
. . .
7-3
Site
. . .
7-3
Requirements, Environmental
. . .
1-3
Requirements, Site
. . .
1-3
RJ61 Wiring and Pinouts
. . .
3-2
S
Saving and Backing Up Your Configuration
. . .
2-52
Securing the Main Cabinet to a Rack
. . .
1-13
Securing the Main Cabinet to the Floor
. . .
1-6
Securing the Main Cabinet to the Wall
. . .
1-10
Setting Up Extension Circuit Types
. . .
2-52
SHUBU
. . .
2-43
Single Line Extension Cabling
. . .
3-4
Site Requirements
. . .
1-3
,
7-3
SLIU PCB / SLIDB Specifications
. . .
7-6
Slots
. . .
2-1
SLT ADAPTER
. . .
4-34
SLT Adapter
Installing
. . .
4-34
Wall-Mounting
. . .
4-35
SLT Adapter Specifications
. . .
7-6
SLT Off-Premise Extension PCB
. . .
2-26
SMDR
. . .
5-4
Installing
. . .
5-4
Programming
. . .
5-5
SMDR and Data
. . .
5-1
Software, Upgrading
. . .
2-52
Specifications
2PGDAD Module/NTCPU Input/Output
. . .
7-5
BGM/MOH Source Input
. . .
7-5
Cable Requirements
. . .
7-6
–
7-7
Cabling Requirements
. . .
7-6
Door Box/External Paging
. . .
7-5
Electrical
. . .
7-4
Environmental
. . .
7-3
LAN
. . .
7-5
Mechanical
. . .
7-4
SLIU PCB / SLIDB
. . .
7-6
SLT Adapter
. . .
7-6
Specifications and Parts List
. . .
7-1
Startup
. . .
2-50
Station Equipment Part Numbers
. . .
7-8
Super Display
Positioning the Super Display LCD
. . .
3-12
Switch Settings and LED Indications
. . .
2-9
System and Alarm Reports, Programming
. . .
5-3
System Capacities
Aspila EX
. . .
7-1
System Phone
Positioning the Super Display LCD
. . .
3-12
System Phone Cabling
. . .
3-3
System Phone Labeling
. . .
4-17
System Specifications
. . .
7-1
System Startup
. . .
2-50
System Telephone
Installing
. . .
3-3
T
T1/PRI
Initial Install
. . .
2-2
Telephone
Installing
. . .
3-3
,
6-6
Troubleshooting
. . .
3-11
Telephone Operation
Positioning the Super Display LCD
. . .
3-12
Test Calls
. . .
2-53
Test Mode
Quitting
. . .
3-11
Testing Telephone Operation
. . .
3-11
Tie Line
Loop Back Testing
. . .
2-29
Tie Line (4TLIU) PCB
. . .
2-28
Tie Lines
Installing
. . .
3-9
Troubleshooting
. . .
2-54
Telephone Operation
. . .
3-11
Trunk
Initial Install
. . .
2-2
Trunk PCBs
Initial Install
. . .
2-49
U
Uninstalling a PCB Slot Through Software
. . .
2-4
Unpacking
. . .
1-3
Upgrade Your Software
. . .
2-13
CÔNG TY VIỄN THÔNG VIỆT PRO
Chuyên phân phối tổng đài NEC
http://vietpro.com.vn