Site Preparation
47
Considerations for Enclosed Installations
Terminals that are mounted in an enclosure must meet certain thermal
and environmental requirements as illustrated and noted in the
following pages.
Ventilation Clearances
Verify that all clearance specifications are met as shown below.
38 mm
1.5 in.
76 mm
(3 in.)
154 mm
(6 in.)
356 mm
(14 in.)
203 mm
(8 in.)
25 mm
(1 in.)
Door Shown
Open
203 mm
(8 in.)
38 mm
1.5 in.
17315
Note:
The enclosure in this illustration is typical and is for clearance
specifications only.
Содержание EasyPoint 7401
Страница 1: ...NCR EasyPoint 7401 Release 2 4 Site Preparation Guide 19797 NCR B005 0000 1255 Issue C...
Страница 8: ...vi Site Preparation...
Страница 20: ...2 Site Preparation 7401 45xx Model 19889d...
Страница 57: ...Site Preparation 39 Terminal with K521 Wall Mount 19291 7 in 8 7 in 4 in 7 8 in K521...
Страница 58: ...40 Site Preparation 17715 Wall Bracket Lag Screws 4 1 2 m 48 in Recommended Height from Floor K521 Wall Mount...
Страница 61: ...Site Preparation 43 17593 Wall Bracket Lag Screws 6 1 2 m 48 in Recommended Height from Floor K525 Wall Mount...
Страница 62: ...44 Site Preparation Mounting Screw on both sides 17735 K525 with K530 Pole Mount Straps...
Страница 84: ......
Страница 89: ......
Страница 90: ...B005 0000 1255 May 2002 Printed on recycled paper...