48
Site Preparation
Thermal Test Points
With the terminal installed in the enclosure, verify that the temperature
does not exceed 45
o
C (115
o
F) in the operating environment. Thermal
test points are shown below:
17316
Thermal Test Points
(Both sides of terminal)
Note:
For terminal servicing information refer to NCR EasyPoint 7401
Hardware Service Guide (B005-0000-1341).
Service Access
The enclosure must provide access to certain locations for service
purposes. The 7401 can be mounted as a stand-alone unit, with a
printer module attached, or terminal and printer mounted separately.
Содержание EasyPoint 7401
Страница 1: ...NCR EasyPoint 7401 Release 2 4 Site Preparation Guide 19797 NCR B005 0000 1255 Issue C...
Страница 8: ...vi Site Preparation...
Страница 20: ...2 Site Preparation 7401 45xx Model 19889d...
Страница 57: ...Site Preparation 39 Terminal with K521 Wall Mount 19291 7 in 8 7 in 4 in 7 8 in K521...
Страница 58: ...40 Site Preparation 17715 Wall Bracket Lag Screws 4 1 2 m 48 in Recommended Height from Floor K521 Wall Mount...
Страница 61: ...Site Preparation 43 17593 Wall Bracket Lag Screws 6 1 2 m 48 in Recommended Height from Floor K525 Wall Mount...
Страница 62: ...44 Site Preparation Mounting Screw on both sides 17735 K525 with K530 Pole Mount Straps...
Страница 84: ......
Страница 89: ......
Страница 90: ...B005 0000 1255 May 2002 Printed on recycled paper...