x
Site Preparation
System Cables 60
Cable Illustrations ......................................................... 62
Dual Cash Drawer, Y-cable .................................... 62
Ethernet, 10/100 Base-T.......................................... 62
USB ........................................................................... 63
External CD-ROM Cable ........................................ 63
External Parallel Cable............................................ 64
Power, AC................................................................ 64
Environmental Requirements 65
Barometric Pressure ...................................................... 65
Temperature .................................................................. 65
Humidity........................................................................ 65
AC Power Line Transient Protection 1
Data Line Transient Protection....................................... 2
Содержание EasyPoint 7401
Страница 1: ...NCR EasyPoint 7401 Release 2 4 Site Preparation Guide 19797 NCR B005 0000 1255 Issue C...
Страница 8: ...vi Site Preparation...
Страница 20: ...2 Site Preparation 7401 45xx Model 19889d...
Страница 57: ...Site Preparation 39 Terminal with K521 Wall Mount 19291 7 in 8 7 in 4 in 7 8 in K521...
Страница 58: ...40 Site Preparation 17715 Wall Bracket Lag Screws 4 1 2 m 48 in Recommended Height from Floor K521 Wall Mount...
Страница 61: ...Site Preparation 43 17593 Wall Bracket Lag Screws 6 1 2 m 48 in Recommended Height from Floor K525 Wall Mount...
Страница 62: ...44 Site Preparation Mounting Screw on both sides 17735 K525 with K530 Pole Mount Straps...
Страница 84: ......
Страница 89: ......
Страница 90: ...B005 0000 1255 May 2002 Printed on recycled paper...