
I
nstallation Check list 39
After installing the boiler, review the following checklist. Co
m
plete the boiler start-up process by carrying out the checks listed in the
table below.
I
f you have additional
q
uestions or need assistance with installation, contact an official Technical Assistance Service (TAS), or refer to the
technical support section of Navien’s website (www.navien.co.uk).
Check
Value measured
Notes
Check that the boiler is filled with water and check for any leaks in the heating
installation.
Check the gas type.
I
f the reference label is changed on gas type changeover, check the gas inlet pressure.
Check that the gas circuit is her
m
etically sealed.
Check that the control panel is working correctly.
Ɣ
Check that it functions nor
m
ally when the boiler is switched on.
Ɣ
Check that the heating syste
m
water pressure is correct.
Ɣ
Check that the heating te
m
perature indicated is correct.
Ɣ
Check that the DHW te
m
perature indicated is correct.
Ɣ
Check that the reset operation is perfor
m
ed correctly.
Ɣ
Check that the para
m
eters on the technical
m
enu are correctly adjusted.
M
easure the C
O
2
values.
Check that the boiler works correctly with the outdoor te
m
perature sensor, if it has a
sensor connected.
Check that the anti-frost function is working correctly.
Check that the condensate drain pu
m
p is working, if the boiler has one.
9. Installation Check list
Содержание NCB-24LDWE
Страница 65: ...Appendices 65 12 4 Ladder Diagram 3 15A...
Страница 69: ...Memo...
Страница 70: ...Memo...
Страница 71: ...Memo...