
30 Flue Syste
m
Dual Duct System
For dual duct syste
m
, fit the co
m
ponents as shown in the figure:
1. Re
m
ove the air intake cap.
Air intake cap
2. Connect the corresponding adapters to the boiler (the gas
re
m
oval and air intake adapters).
Adapter
3. Connect the gas re
m
oval and intake ducts.
Exhaustion and intake ducts
Note
Ɣ
For vertical ducts, the outlet
m
ust be at least 60 c
m
fro
m
any opening.
Ɣ
The di
m
ensions (B, C, D, and E)
m
ay be reduced to
25
mm
, as long as the flue ter
m
inal is extended to
clear any overhangs.
6.2 Selecting a Flue System
WARNING
Ɣ
The gas re
m
oval ducts
m
ust not be in contact with
or near fla
mm
able
m
aterials and they
m
ust not pass
through any structures or walls of buildings
m
ade of
such
m
aterials.
Ɣ
I
f you replace the boiler, the old gas re
m
oval syste
m
m
ust be replaced by a new one.
Ɣ
The standard flue
m
ust be installed level.
I
f flue
extensions are needed, they
m
ust have a 3 degree fall
back to the appliance.
The fu
m
e extraction connection depends on the type of syste
m
chosen (coaxial re
m
oval syste
m
or dual duct re
m
oval syste
m
).
Carefully follow the instructions given below:
Coaxial System
For coaxial syste
m
, fit the co
m
ponents as shown in the figure:
Adapter
Содержание NCB-24LDWE
Страница 65: ...Appendices 65 12 4 Ladder Diagram 3 15A...
Страница 69: ...Memo...
Страница 70: ...Memo...
Страница 71: ...Memo...